X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0185020816000

Well Details

Well ID: 0185020816000
Loading map...
Location: 00/16-08-018-02W5/0
Location Alias: 00/16-08-18-02 W5M
Location Alias 2: 00/16-08-018-02 W5/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 5
Range: 02
Section: 08
County/Municipality: Foothills County
Well Name: CPEC NW HUDSONS BAY 1 TV 16-8-18-2
Operator Name: Crescent Point Energy Corp.
License Number: B0000011
License Date: 1938-12-04
License Status: Abandoned
Spud Date: 1938-12-02
Final Drill Date: 1939-04-12
Well Total Depth: 2284.20 m
Surface Hole Latitude: 50.512029
Surface Hole Longitude: -114.232909

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1938-12-04 Obtained License
1939-03-27 Production Casing Operation Performed
1939-04-12 Finished Drilling
1939-04-12 Perforation Treatment Performed - Open-Hole Completion
1939-04-12 Well Mode changed to Drilled and Cased
1939-04-14 Perforation Treatment Performed - Acid Wash - No Pressure
1939-04-17 Well Began Production
1939-04-17 Well Fluid changed to Crude Oil
1939-04-17 Well Mode changed to Flowing
1970-07-12 Well Began Injection
1970-07-12 Well Fluid changed to Water
1970-07-12 Well Type changed to Injection
2004-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-06 Plug Back Performed
2004-06-06 Well Fluid changed to Water
2004-06-06 Well Log Performed
2004-06-06 Well Mode changed to Abandoned Zone
2004-06-06 Well Type changed to Injection
2004-06-15 Perforation Treatment Performed - Jet Perforation
2004-06-15 Perforation Treatment Performed - Remedial Casing
2004-06-15 Well Log Performed
2004-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-17 Plug Back Performed
2005-04-24 Well Abandoned
2005-04-24 Well Fluid changed to Water
2005-04-24 Well Mode changed to Abandoned
2005-04-24 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1939-04-12 Open Hole/Barefoot Completion 2150.70 2284.20 0
1939-04-14 Acid Wash 2150.70 2284.20 0
2004-06-06 Packing Device Capped w/Cement 2131.80 2139.80 0
2004-06-15 Perforation 732.00 733.00 13
2004-06-15 Remedial Casing Cementing 732.00 733.00 0
2004-06-17 Packing Device Capped w/Cement 690.00 720.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 230 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0

For data sources see[5]

References