X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0185020815000

Well Details

Well ID: 0185020815000
Loading map...
Location: 00/15-08-018-02W5/0
Location Alias: 00/15-08-18-02 W5M
Location Alias 2: 00/15-08-018-02 W5/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 5
Range: 02
Section: 08
County/Municipality: Foothills County
Well Name: CPEC TV 15-8-18-2
Operator Name: Crescent Point Energy Corp.
License Number: B0000075
License Date: 1939-10-20
License Status: Issued
Spud Date: 1939-12-11
Final Drill Date: 1940-05-03
Well Total Depth: 2475.00 m
Surface Hole Latitude: 50.511764
Surface Hole Longitude: -114.239619

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1939-10-20 Obtained License
1940-04-01 Production Casing Operation Performed
1940-05-03 Finished Drilling
1940-05-03 Perforation Treatment Performed - Open-Hole Completion
1940-05-03 Well Mode changed to Drilled and Cased
1940-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1940-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1940-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1940-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1940-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1940-05-18 Well Began Production
1940-05-18 Well Fluid changed to Crude Oil
1940-05-18 Well Mode changed to Flowing
1964-02-14 Well Fluid changed to Crude Oil
1964-02-14 Well Mode changed to Gas Lift
1967-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-11-03 Well Fluid changed to Crude Oil
1967-11-03 Well Mode changed to Pumping
2003-09-17 Well Log Performed
2003-09-23 Well Log Performed
2005-12-04 Well Log Performed
2005-12-05 Well Log Performed
2006-03-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1940-05-03 Open Hole/Barefoot Completion 2347.00 2475.00 0
1940-05-04 Acid Treatment 2347.00 2475.00 0
1940-05-09 Acid Treatment 2347.00 2475.00 0
1940-05-16 Acid Treatment 2347.00 2475.00 0
1940-05-17 Acid Treatment 2347.00 2475.00 0
1940-05-18 Acid Treatment 2347.00 2475.00 0
1967-10-25 Acid Treatment 2347.00 2468.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 690 0.0 0.0 0.0
1968 3170 0.0 0.0 0.0
1969 7539 0.0 0.0 0.0
1970 8514 0.0 0.0 0.0
1971 8281 0.0 0.0 0.0
1972 7031 0.0 0.0 0.0
1973 7780 0.0 0.0 0.0
1974 6117 0.0 0.0 0.0
1975 5948 0.0 0.0 0.0
1976 6499 0.0 0.0 0.0
1977 7981 0.0 0.0 0.0
1978 7428 0.0 0.0 0.0
1979 7881 0.0 0.0 0.0
1980 7595 0.0 0.0 0.0
1981 6404 0.0 0.0 0.0
1982 6481 0.0 0.0 0.0
1983 7785 0.0 0.0 0.0
1984 7410 0.0 0.0 0.0
1985 7814 0.0 0.0 0.0
1986 7879 0.0 0.0 0.0
1987 7225 0.0 0.0 0.0
1988 7851 0.0 0.0 0.0
1989 7681 0.0 0.0 0.0
1990 7572 0.0 0.0 0.0
1991 8096 0.0 0.0 0.0
1992 7718 0.0 0.0 0.0
1993 7475 0.0 0.0 0.0
1994 8067 0.0 0.0 0.0
1995 7612 0.0 0.0 0.0
1996 8080 0.0 0.0 0.0
1997 8317 0.0 0.0 0.0
1998 8302 0.0 0.0 0.0
1999 8392 0.0 0.0 0.0
2000 8160 0.0 0.0 0.0
2001 7989 0.0 0.0 0.0
2002 8073 0.0 0.0 0.0
2003 6242 0.0 0.0 0.0
2004 7894 0.0 0.0 0.0
2005 1755 0.0 0.0 0.0
2006 6314 0.0 0.0 0.0
2007 8137 0.0 0.0 0.0
2008 8307 0.0 0.0 0.0
2009 2814 0.0 0.0 0.0
2010 8285 0.0 0.0 0.0
2011 8407 0.0 0.0 0.0
2012 7605 0.0 0.0 0.0
2013 7157 0.0 0.0 0.0
2014 8654 0.0 0.0 0.0
2015 8209 0.0 0.0 0.0
2016 7796 0.0 0.0 0.0
2017 7433 0.0 0.0 0.0
2018 8709 0.0 0.0 0.0
2019 8556 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[5]

References