X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0185020808000

Well Details

Well ID: 0185020808000
Loading map...
Location: 00/08-08-018-02W5/0
Location Alias: 00/08-08-18-02 W5M
Location Alias 2: 00/08-08-018-02 W5/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 5
Range: 02
Section: 08
County/Municipality: Foothills County
Well Name: CPEC NW HUDSONS BAY 12 TV 8-8-18-2
Operator Name: Crescent Point Energy Corp.
License Number: B0000376
License Date: 1942-10-17
License Status: Issued
Spud Date: 1942-10-20
Final Drill Date: 1943-02-28
Well Total Depth: 2366.50 m
Surface Hole Latitude: 50.504900
Surface Hole Longitude: -114.234457

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1942-10-17 Obtained License
1943-02-02 Production Casing Operation Performed
1943-02-28 Finished Drilling
1943-02-28 Perforation Treatment Performed - Open-Hole Completion
1943-02-28 Well Mode changed to Drilled and Cased
1943-03-02 Perforation Treatment Performed - Acid Wash - No Pressure
1943-03-10 Perforation Treatment Performed - Acid Wash - No Pressure
1943-03-10 Well Began Production
1943-03-10 Well Fluid changed to Crude Oil
1943-03-10 Well Mode changed to Flowing
1958-05-30 Well Fluid changed to Crude Oil
1958-05-30 Well Mode changed to Suspended
1960-03-09 Well Fluid changed to Crude Oil
1960-03-09 Well Mode changed to Flowing
1967-01-26 Well Fluid changed to Crude Oil
1967-01-26 Well Mode changed to Pumping
1975-06-20 Well Fluid changed to Crude Oil
1975-06-20 Well Mode changed to Flowing
2005-08-11 Well Log Performed
2005-08-13 Perforation Treatment Performed - Jet Perforation
2005-08-13 Well Log Performed
2005-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-08-19 Perforation Treatment Performed - Cement Squeeze
2005-08-19 Plug Back Performed
2005-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-05-01 Well Fluid changed to Crude Oil
2014-05-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1943-02-28 Open Hole/Barefoot Completion 2213.50 2366.50 0
1943-03-02 Acid Wash 2213.50 2366.50 0
1943-03-10 Acid Wash 2213.50 2366.50 0
2005-08-13 Perforation 2206.00 2209.00 17
2005-08-14 Acid Treatment 2206.00 2209.00 0
2005-08-19 Cement Squeeze 2206.00 2209.00 0
2005-10-20 Acid Treatment 2213.50 2366.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 386 0.0 0.0 0.0
1968 3123 0.0 0.0 0.0
1969 8070 0.0 0.0 0.0
1970 8235 0.0 0.0 0.0
1971 8176 0.0 0.0 0.0
1972 6649 0.0 0.0 0.0
1973 7097 0.0 0.0 0.0
1974 7141 0.0 0.0 0.0
1975 6424 0.0 0.0 0.0
1976 7018 0.0 0.0 0.0
1977 4373 0.0 0.0 0.0
1978 7265 0.0 0.0 0.0
1979 8443 0.0 0.0 0.0
1980 8275 0.0 0.0 0.0
1981 7341 0.0 0.0 0.0
1982 8331 0.0 0.0 0.0
1983 8263 0.0 0.0 0.0
1984 7686 0.0 0.0 0.0
1985 8090 0.0 0.0 0.0
1986 8087 0.0 0.0 0.0
1987 8143 0.0 0.0 0.0
1988 8090 0.0 0.0 0.0
1989 8062 0.0 0.0 0.0
1990 8208 0.0 0.0 0.0
1991 8307 0.0 0.0 0.0
1992 8284 0.0 0.0 0.0
1993 7943 0.0 0.0 0.0
1994 8166 0.0 0.0 0.0
1995 7760 0.0 0.0 0.0
1996 7525 0.0 0.0 0.0
1997 8598 0.0 0.0 0.0
1998 8417 0.0 0.0 0.0
1999 8166 0.0 0.0 0.0
2000 8555 0.0 0.0 0.0
2001 7890 0.0 0.0 0.0
2002 7522 0.0 0.0 0.0
2003 8293 0.0 0.0 0.0
2004 8026 0.0 0.0 0.0
2005 4497 0.0 0.0 0.0
2006 5910 0.0 0.0 0.0
2007 7835 0.0 0.0 0.0
2008 8472 0.0 0.0 0.0
2009 4104 0.0 0.0 0.0
2010 7899 0.0 0.0 0.0
2011 8415 0.0 0.0 0.0
2012 7284 0.0 0.0 0.0
2013 4018 0.0 0.0 0.0
2014 6660 0.0 0.0 0.0
2015 6338 0.0 0.0 0.0
2016 8530 0.0 0.0 0.0
2017 8680 0.0 0.0 0.0
2018 6890 0.0 0.0 0.0
2019 8178 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[5]

References