X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0185020807000

Well Details

Well ID: 0185020807000
Loading map...
Location: 00/07-08-018-02W5/0
Location Alias: 00/07-08-18-02 W5M
Location Alias 2: 00/07-08-018-02 W5/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 5
Range: 02
Section: 08
County/Municipality: Foothills County
Well Name: CPEC NW HUDSONS BAY 6 TV 7-8-18-2
Operator Name: Crescent Point Energy Corp.
License Number: B0000182
License Date: 1941-03-13
License Status: RecCertified
Spud Date: 1941-05-02
Final Drill Date: 1941-09-20
Well Total Depth: 2510.00 m
Surface Hole Latitude: 50.504036
Surface Hole Longitude: -114.239271

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1941-03-13 Obtained License
1941-09-05 Production Casing Operation Performed
1941-09-20 Finished Drilling
1941-09-20 Perforation Treatment Performed - Open-Hole Completion
1941-09-20 Well Mode changed to Drilled and Cased
1941-09-22 Perforation Treatment Performed - Acid Wash - No Pressure
1941-09-25 Perforation Treatment Performed - Acid Wash - No Pressure
1941-09-26 Well Began Production
1941-09-26 Well Fluid changed to Crude Oil
1941-09-26 Well Mode changed to Flowing
1962-02-10 Well Fluid changed to Crude Oil
1962-02-10 Well Mode changed to Gas Lift
1965-01-11 Well Began Injection
1965-01-11 Well Fluid changed to Water
1965-01-11 Well Type changed to Injection
1992-06-23 Well Log Performed
1992-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-25 Perforation Treatment Performed - Cement Plug
1992-06-25 Perforation Treatment Performed - Cement Squeeze
1992-06-25 Plug Back Performed
1992-06-25 Well Fluid changed to Water
1992-06-25 Well Mode changed to Abandoned
1992-06-25 Well Type changed to Injection
1992-06-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1941-09-20 Open Hole/Barefoot Completion 2381.70 2510.00 0
1941-09-22 Acid Wash 2381.70 2510.00 0
1941-09-25 Acid Wash 2381.70 2510.00 0
1992-06-25 Cement Squeeze 2381.70 2510.00 0
1992-06-25 Packing Device Capped w/Cement 2332.00 2357.00 0
1992-06-25 Cement Plug 190.00 1450.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0

For data sources see[5]

References