X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0184290105002

Well Details

Well ID: 0184290105002
Loading map...
Location: 00/05-01-018-29W4/2
Location Alias: 00/05-01-18-29 W4M
Location Alias 2: 00/05-01-018-29 W4/02
Country: Canada
Province: Alberta
Township: 018
Meridian: 4
Range: 29
Section: 01
County/Municipality: Foothills County
Well Name: COMPTON HIGH RIVER 5-1-18-29
Operator Name: Lexin Resources Ltd.
License Number: 0238088
License Date: 2000-06-02
License Status: Suspension
Spud Date: 2000-06-06
Final Drill Date: 2000-06-25
Well Total Depth: 2658.00 m
Surface Hole Latitude: 50.492586
Surface Hole Longitude: -113.866127

For data sources see[1][2]

Well History

Date Event
2000-06-02 Obtained License
2000-06-08 Surface Casing Operation Performed
2000-06-12 Direction Drilling Operation Performed - Deviate
2000-06-22 Drill Stem Test Performed
2000-06-25 Finished Drilling
2000-06-25 Well Mode changed to Drilled and Cased
2000-06-26 Well Log Performed
2000-06-27 Drill Stem Test Performed
2000-06-29 Drill Stem Test Performed
2000-06-30 Production Casing Operation Performed
2000-07-01 Rig Released
2000-07-16 Perforation Treatment Performed - Jet Perforation
2002-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-24 Plug Back Performed
2002-10-24 Well Log Performed
2002-10-25 Perforation Treatment Performed - Jet Perforation
2002-10-25 Well Log Performed
2002-10-26 Perforation Treatment Performed - Fractured
2002-10-29 Perforation Treatment Performed - Jet Perforation
2002-10-30 Perforation Treatment Performed - Fractured
2013-10-09 Well Log Performed
2013-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-10 Plug Back Performed
2013-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-12 Plug Back Performed
2013-10-12 Well Mode changed to Abandoned Zone
2019-10-29 Perforation Treatment Performed - Cement Plug
2019-10-29 Perforation Treatment Performed - Jet Perforation
2019-10-29 Plug Back Performed
2019-10-29 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-06-12 517.10 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-07-16 Perforation 2565.00 2566.00 17
2019-10-29 Perforation 600.00 601.00 13
2019-10-29 Perforation 514.00 515.00 13
2019-10-29 Perforation 470.00 471.00 13
2019-10-29 Cement Plug 346.00 616.00 0
2000-07-16 Perforation 2568.00 2570.00 17
2002-10-24 Packing Device Capped w/Cement 2547.00 2555.00 0
2002-10-25 Perforation 1298.00 1300.00 17
2002-10-26 Fracture 1298.00 1300.00 0
2002-10-29 Perforation 1260.00 1264.00 17
2002-10-30 Fracture 1260.00 1264.00 0
2013-10-10 Packing Device Capped w/Cement 1276.00 1284.00 0
2013-10-12 Packing Device Capped w/Cement 1247.00 1255.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-09 No Incident Encountered 0.00 0.00
2013-10-11 No Incident Encountered 0.00 0.00
2019-10-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References