If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0184180513000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/13-05-018-18W4/0 | |
| Location Alias: 00/13-05-18-18 W4M | |
| Location Alias 2: 00/13-05-018-18 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 018 | |
| Meridian: 4 | |
| Range: 18 | |
| Section: 05 | |
| County/Municipality: Vulcan County | |
| Well Name: TXNE EYRMOR 13-5-18-18 | |
| Operator Name: Torxen Energy Ltd. | |
| License Number: 0294769 | |
| License Date: 2003-10-21 | |
| License Status: Issued | |
| Spud Date: 2003-11-20 | |
| Final Drill Date: 2003-11-26 | |
| Well Total Depth: 1253.00 m | |
| Surface Hole Latitude: 50.497649 | |
| Surface Hole Longitude: -112.451096 |
| Date | Event |
|---|---|
| 2003-10-21 | Obtained License |
| 2003-11-21 | Surface Casing Operation Performed |
| 2003-11-26 | Finished Drilling |
| 2003-11-26 | Well Log Performed |
| 2003-11-26 | Well Mode changed to Drilled and Cased |
| 2003-11-27 | Well Log Performed |
| 2003-11-28 | Production Casing Operation Performed |
| 2003-11-28 | Rig Released |
| 2004-05-08 | Well Log Performed |
| 2005-04-06 | Perforation Treatment Performed - Jet Perforation |
| 2005-10-29 | Perforation Treatment Performed - Fractured |
| 2005-11-22 | Well Log Performed |
| 2005-11-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2005-11-24 | Perforation Treatment Performed - Cement Squeeze |
| 2005-11-27 | Perforation Treatment Performed - Jet Perforation |
| 2005-11-29 | Perforation Treatment Performed - Fractured |
| 2007-06-01 | Well Began Production |
| 2007-06-01 | Well Fluid changed to Gas |
| 2007-06-01 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-04-06 | Perforation | 908.00 | 910.00 | 7 |
| 2005-04-06 | Perforation | 760.00 | 762.00 | 7 |
| 2005-04-06 | Perforation | 745.00 | 747.00 | 7 |
| 2005-04-06 | Perforation | 729.00 | 731.00 | 7 |
| 2005-04-06 | Perforation | 712.00 | 714.00 | 7 |
| 2005-04-06 | Perforation | 693.00 | 695.00 | 7 |
| 2005-04-06 | Perforation | 675.00 | 677.00 | 7 |
| 2005-04-06 | Perforation | 660.00 | 662.00 | 7 |
| 2005-04-06 | Perforation | 645.00 | 647.00 | 7 |
| 2005-04-06 | Perforation | 589.00 | 591.00 | 7 |
| 2005-04-06 | Perforation | 578.00 | 580.00 | 7 |
| 2005-04-06 | Perforation | 896.00 | 898.00 | 7 |
| 2005-04-06 | Perforation | 565.00 | 567.00 | 7 |
| 2005-10-29 | Fracture | 860.00 | 862.00 | 0 |
| 2005-10-29 | Fracture | 850.00 | 852.00 | 0 |
| 2005-10-29 | Fracture | 836.00 | 838.00 | 0 |
| 2005-10-29 | Fracture | 821.00 | 823.00 | 0 |
| 2005-10-29 | Fracture | 798.00 | 800.00 | 0 |
| 2005-10-29 | Fracture | 779.00 | 781.00 | 0 |
| 2005-11-24 | Cement Squeeze | 908.00 | 910.00 | 0 |
| 2005-11-24 | Cement Squeeze | 896.00 | 898.00 | 0 |
| 2005-11-24 | Cement Squeeze | 877.00 | 879.00 | 0 |
| 2005-04-06 | Perforation | 877.00 | 879.00 | 7 |
| 2005-11-24 | Cement Squeeze | 860.00 | 862.00 | 0 |
| 2005-11-24 | Cement Squeeze | 850.00 | 852.00 | 0 |
| 2005-11-24 | Cement Squeeze | 836.00 | 838.00 | 0 |
| 2005-11-24 | Cement Squeeze | 821.00 | 823.00 | 0 |
| 2005-11-24 | Cement Squeeze | 798.00 | 800.00 | 0 |
| 2005-11-24 | Cement Squeeze | 779.00 | 781.00 | 0 |
| 2005-11-24 | Cement Squeeze | 760.00 | 762.00 | 0 |
| 2005-11-24 | Cement Squeeze | 745.00 | 747.00 | 0 |
| 2005-11-24 | Packing Device Capped w/Cement | 735.00 | 766.00 | 0 |
| 2005-11-27 | Perforation | 620.00 | 622.00 | 7 |
| 2005-04-06 | Perforation | 860.00 | 862.00 | 7 |
| 2005-11-27 | Perforation | 600.00 | 602.00 | 7 |
| 2005-11-27 | Perforation | 552.00 | 554.00 | 7 |
| 2005-11-27 | Perforation | 539.00 | 541.00 | 7 |
| 2005-11-27 | Perforation | 521.00 | 523.00 | 7 |
| 2005-11-27 | Perforation | 503.00 | 505.00 | 7 |
| 2005-11-27 | Perforation | 489.00 | 491.00 | 7 |
| 2005-11-29 | Fracture | 620.00 | 622.00 | 0 |
| 2005-04-06 | Perforation | 850.00 | 852.00 | 7 |
| 2005-04-06 | Perforation | 836.00 | 838.00 | 7 |
| 2005-04-06 | Perforation | 821.00 | 823.00 | 7 |
| 2005-04-06 | Perforation | 798.00 | 800.00 | 7 |
| 2005-04-06 | Perforation | 779.00 | 781.00 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2007 | 4908 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8759 | 0.0 | 0.0 | 0.0 |
| 2012 | 8783 | 0.0 | 0.0 | 0.0 |
| 2013 | 8752 | 0.0 | 0.0 | 0.0 |
| 2014 | 8748 | 0.0 | 0.0 | 0.0 |
| 2015 | 8759 | 0.0 | 0.0 | 0.0 |
| 2016 | 8768 | 0.0 | 0.0 | 0.0 |
| 2017 | 8747 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8735 | 0.0 | 0.0 | 0.0 |
| 2020 | 2111 | 0.0 | 0.0 | 0.0 |
For data sources see[5]