X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0184162506030

Well Details

Well ID: 0184162506030
Loading map...
Location: 03/06-25-018-16W4/0
Location Alias: 03/06-25-18-16 W4M
Location Alias 2: 03/06-25-018-16 W4/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 4
Range: 16
Section: 25
County/Municipality: County of Newell
Well Name: TXNE 103 COUNTESS 6-25-18-16
Operator Name: Torxen Energy Ltd.
License Number: 0282334
License Date: 2003-02-07
License Status: Issued
Spud Date: 2003-08-06
Final Drill Date: 2003-08-08
Well Total Depth: 1123.00 m
Surface Hole Latitude: 50.547247
Surface Hole Longitude: -112.080060

For data sources see[1][2]

Well History

Date Event
2003-02-07 Obtained License
2003-08-06 Surface Casing Operation Performed
2003-08-08 Finished Drilling
2003-08-08 Production Casing Operation Performed
2003-08-08 Rig Released
2003-08-08 Well Log Performed
2003-08-08 Well Mode changed to Drilled and Cased
2003-08-25 Perforation Treatment Performed - Jet Perforation
2003-08-25 Well Log Performed
2003-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-01 Plug Back Performed
2003-10-01 Well Log Performed
2003-10-01 Well Mode changed to Abandoned Zone
2004-11-10 Well Log Performed
2004-11-12 Perforation Treatment Performed - Jet Perforation
2004-11-16 Perforation Treatment Performed - Fractured
2005-02-28 Perforation Treatment Performed - Jet Perforation
2005-03-04 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-08-25 Perforation 1049.00 1051.00 17
2005-02-28 Perforation 690.00 692.00 7
2005-02-28 Perforation 673.00 675.00 7
2005-02-28 Perforation 664.00 666.00 7
2005-02-28 Perforation 646.00 648.00 7
2005-02-28 Perforation 632.00 634.00 7
2005-02-28 Perforation 617.00 619.00 7
2005-02-28 Perforation 604.00 606.00 7
2005-02-28 Perforation 589.00 591.00 7
2005-02-28 Perforation 572.00 574.00 7
2005-02-28 Perforation 558.00 560.00 7
2003-08-25 Perforation 1042.00 1044.00 17
2005-02-28 Perforation 548.00 550.00 7
2005-02-28 Perforation 536.00 538.00 7
2005-02-28 Perforation 497.00 499.00 7
2005-02-28 Perforation 487.00 489.00 7
2005-02-28 Perforation 477.00 479.00 7
2005-03-04 Fracture 727.00 729.00 0
2005-03-04 Fracture 706.00 708.00 0
2005-03-04 Fracture 690.00 692.00 0
2005-03-04 Fracture 673.00 675.00 0
2005-03-04 Fracture 664.00 666.00 0
2003-10-01 Packing Device Capped w/Cement 1032.00 1040.00 0
2005-03-04 Fracture 646.00 648.00 0
2005-03-04 Fracture 632.00 634.00 0
2005-03-04 Fracture 617.00 619.00 0
2005-03-04 Fracture 604.00 606.00 0
2005-03-04 Fracture 589.00 591.00 0
2005-03-04 Fracture 572.00 574.00 0
2005-03-04 Fracture 558.00 560.00 0
2005-03-04 Fracture 548.00 550.00 0
2005-03-04 Fracture 536.00 538.00 0
2005-03-04 Fracture 497.00 499.00 0
2004-11-12 Perforation 784.00 787.00 7
2005-03-04 Fracture 487.00 489.00 0
2005-03-04 Fracture 477.00 479.00 0
2004-11-12 Perforation 770.00 773.00 7
2004-11-16 Fracture 770.00 787.00 0
2005-02-28 Perforation 750.00 752.00 7
2005-02-28 Perforation 727.00 729.00 7
2005-02-28 Perforation 706.00 708.00 7

For data sources see[4]



References