X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0184150110000

Well Details

Well ID: 0184150110000
Loading map...
Location: 00/10-01-018-15W4/0
Location Alias: 00/10-01-18-15 W4M
Location Alias 2: 00/10-01-018-15 W4/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 4
Range: 15
Section: 01
County/Municipality: County of Newell
Well Name: CVE COUNTESS 10-1-18-15
Operator Name: Cenovus Energy Inc.
License Number: 0032489
License Date: 1967-07-18
License Status: RecCertified
Spud Date: 1967-07-19
Final Drill Date: 1967-07-26
Well Total Depth: 1069.20 m
Surface Hole Latitude: 50.493906
Surface Hole Longitude: -111.937612

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-07-18 Obtained License
1967-07-26 Finished Drilling
1967-07-26 Well Mode changed to Drilled and Cased
1967-07-27 Drill Stem Test Performed
1967-07-28 Drill Stem Test Performed
1967-07-29 Production Casing Operation Performed
1967-08-08 Perforation Treatment Performed - Jet Perforation
1967-08-15 Well Began Production
1967-08-15 Well Fluid changed to Crude Oil
1967-08-15 Well Mode changed to Flowing
1968-02-19 Well Fluid changed to Crude Oil
1968-02-19 Well Mode changed to Suspended
1972-01-10 Well Fluid changed to Gas
1972-01-10 Well Mode changed to Flowing
1972-10-02 Well Fluid changed to Gas
1972-10-02 Well Mode changed to Suspended
1993-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-25 Plug Back Performed
1993-09-25 Well Fluid changed to Gas
1993-09-25 Well Log Performed
1993-09-25 Well Mode changed to Abandoned
1993-09-26 Perforation Treatment Performed - Jet Perforation
1993-09-26 Well Log Performed
1993-09-28 Perforation Treatment Performed - Remedial Casing
1993-12-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-08-08 Perforation 1037.80 1038.50 13
1993-09-25 Packing Device Capped w/Cement 1018.00 1026.00 0
1993-09-26 Perforation 383.00 384.00 7
1993-09-28 Remedial Casing Cementing 383.00 384.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1972 351 0.0 0.0 0.0

For data sources see[5]

References