X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174280211002

Well Details

Well ID: 0174280211002
Loading map...
Location: 00/11-02-017-28W4/2
Location Alias: 00/11-02-17-28 W4M
Location Alias 2: 00/11-02-017-28 W4/02
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 28
Section: 02
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: CPC SILVER 11-2-17-28
Operator Name: Lexin Resources Ltd.
License Number: 0205865
License Date: 1997-09-09
License Status: Suspension
Spud Date: 1997-09-09
Final Drill Date: 1997-10-02
Well Total Depth: 2432.00 m
Surface Hole Latitude: 50.405084
Surface Hole Longitude: -113.748865

For data sources see[1][2]

Well History

Date Event
1997-09-09 Obtained License
1997-09-12 Surface Casing Operation Performed
1997-09-14 Direction Drilling Operation Performed - Straighten Hole
1997-10-02 Finished Drilling
1997-10-02 Well Log Performed
1997-10-02 Well Mode changed to Drilled and Cased
1997-10-04 Production Casing Operation Performed
1997-10-05 Rig Released
1997-10-11 Well Log Performed
1997-10-12 Perforation Treatment Performed - Jet Perforation
1997-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-24 Plug Back Performed
2006-03-24 Well Log Performed
2006-03-26 Perforation Treatment Performed - Jet Perforation
2006-03-26 Well Log Performed
2006-03-28 Perforation Treatment Performed - Fractured
2006-09-11 Well Began Production
2006-09-11 Well Fluid changed to Gas
2006-09-11 Well Mode changed to Flowing
2010-12-01 Well Fluid changed to Gas
2010-12-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-09-14 830.00 Straighten Hole

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-10-12 Perforation 2356.00 2361.00 14
1997-10-12 Perforation 2362.80 2366.20 14
1997-10-13 Acid Treatment 2356.00 2366.20 0
2006-03-24 Packing Device Capped w/Cement 2335.50 2343.50 0
2006-03-26 Perforation 1180.00 1183.00 17
2006-03-28 Fracture 1180.00 1183.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 2597 0.0 0.0 0.0
2007 6409 0.0 0.0 0.0
2008 7627 0.0 0.0 0.0
2009 6062 0.0 0.0 0.0

For data sources see[6]

References