X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174210106000

Well Details

Well ID: 0174210106000
Loading map...
Location: 00/06-01-017-21W4/0
Location Alias: 00/06-01-17-21 W4M
Location Alias 2: 00/06-01-017-21 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 21
Section: 01
County/Municipality: Vulcan County
Well Name: AMOCO LONG COULEE 6-1-17-21
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0057478
License Date: 1976-03-10
License Status: RecCertified
Spud Date: 1976-03-13
Final Drill Date: 1976-03-21
Well Total Depth: 1382.00 m
Surface Hole Latitude: 50.402966
Surface Hole Longitude: -112.767943

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-03-10 Obtained License
1976-03-21 Finished Drilling
1976-03-21 Well Log Performed
1976-03-21 Well Mode changed to Drilled and Cased
1976-03-22 Drill Stem Test Performed
1976-03-23 Production Casing Operation Performed
1976-04-01 Well Began Production
1976-04-01 Well Fluid changed to Crude Oil
1976-04-01 Well Mode changed to Flowing
1976-04-06 Perforation Treatment Performed - Jet Perforation
1977-04-09 Well Fluid changed to Crude Oil
1977-04-09 Well Mode changed to Suspended
1987-06-01 Well Fluid changed to Crude Oil
1987-06-01 Well Mode changed to Flowing
1987-07-02 Well Fluid changed to Crude Oil
1987-07-02 Well Mode changed to Suspended
1988-03-15 Well Fluid changed to Crude Oil
1988-03-15 Well Mode changed to Flowing
1989-12-01 Well Fluid changed to Crude Oil
1989-12-01 Well Mode changed to Suspended
1990-11-01 Well Fluid changed to Crude Oil
1990-11-01 Well Mode changed to Flowing
1993-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-03 Plug Back Performed
1993-08-03 Well Fluid changed to Crude Oil
1993-08-03 Well Mode changed to Abandoned Zone
1993-08-05 Perforation Treatment Performed - Jet Perforation
1993-08-05 Well Log Performed
1997-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-08 Plug Back Performed
1997-09-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-04-06 Perforation 1342.60 1343.30 7
1993-08-03 Packing Device Capped w/Cement 1327.00 1335.00 0
1993-08-05 Perforation 1085.10 1086.30 13
1997-09-08 Packing Device Capped w/Cement 1069.00 1077.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1775 0.0 0.0 0.0
1977 504 0.0 0.0 0.0
1987 165 0.0 0.0 0.0
1988 6655 0.0 0.0 0.0
1989 8012 0.0 0.0 0.0
1990 1360 0.0 0.0 0.0
1991 6868 0.0 0.0 0.0
1992 2149 0.0 0.0 0.0
1993 10 0.0 0.0 0.0

For data sources see[5]

References