X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174132508000

Well Details

Well ID: 0174132508000
Loading map...
Location: 00/08-25-017-13W4/0
Location Alias: 00/08-25-17-13 W4M
Location Alias 2: 00/08-25-017-13 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 13
Section: 25
County/Municipality: County of Newell
Well Name: CHEVRON CPR BANTRY IN 8-25-17-13
Operator Name: Chevron Canada Limited
License Number: 0023455
License Date: 1962-12-05
License Status: RecCertified
Spud Date: 1963-01-06
Final Drill Date: 1963-01-13
Well Total Depth: 1006.10 m
Surface Hole Latitude: 50.461131
Surface Hole Longitude: -111.656907

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-12-05 Obtained License
1963-01-13 Drill Stem Test Performed
1963-01-13 Finished Drilling
1963-01-13 Well Mode changed to Drilled and Cased
1963-01-15 Production Casing Operation Performed
1963-01-17 Perforation Treatment Performed - Jet Perforation
1963-03-14 Perforation Treatment Performed - Visqueeze
1963-05-09 Well Began Production
1963-05-09 Well Fluid changed to Crude Oil
1963-05-09 Well Mode changed to Flowing
1965-12-03 Well Fluid changed to Crude Oil
1965-12-03 Well Mode changed to Suspended
1967-07-10 Well Began Injection
1967-07-10 Well Fluid changed to Water
1967-07-10 Well Type changed to Disposal
1967-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-11-15 Perforation Treatment Performed - Jet Perforation
1968-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-10-04 Well Fluid changed to Water
1970-10-04 Well Mode changed to Suspended
1970-10-04 Well Type changed to Disposal
1971-07-14 Perforation Treatment Performed - Cement Plug
1990-04-06 Well Log Performed
1990-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-15 Perforation Treatment Performed - Jet Perforation
1990-10-15 Well Log Performed
1990-10-16 Perforation Treatment Performed - Remedial Casing
1990-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-17 Perforation Treatment Performed - Jet Perforation
1990-10-17 Perforation Treatment Performed - Remedial Casing
1990-10-17 Well Log Performed
1990-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-19 Perforation Treatment Performed - Jet Perforation
1990-10-19 Perforation Treatment Performed - Remedial Casing
1990-10-19 Well Log Performed
1990-10-21 Perforation Treatment Performed - Jet Perforation
1990-10-21 Well Log Performed
1990-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-23 Perforation Treatment Performed - Remedial Casing
1990-10-23 Well Log Performed
1995-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-03 Well Abandoned
1995-10-03 Well Fluid changed to Water
1995-10-03 Well Mode changed to Abandoned
1995-10-03 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-01-17 Perforation 988.20 989.40 0
1990-10-16 Remedial Casing Cementing 399.40 400.00 0
1990-10-17 Perforation 299.40 300.00 20
1990-10-17 Acid Treatment 299.40 300.00 0
1990-10-17 Remedial Casing Cementing 299.40 300.00 0
1990-10-19 Perforation 239.40 240.00 20
1990-10-19 Acid Treatment 239.40 240.00 0
1990-10-19 Remedial Casing Cementing 239.40 240.00 0
1990-10-21 Perforation 97.00 97.60 20
1990-10-22 Acid Treatment 97.00 97.60 0
1990-10-23 Remedial Casing Cementing 97.00 97.60 0
1963-03-14 Visqueeze 988.20 989.40 0
1995-10-03 Packing Device Capped w/Cement 84.00 92.00 0
1967-08-21 Acid Treatment 988.20 989.40 0
1967-11-15 Perforation 987.90 990.00 13
1967-11-15 Perforation 986.00 986.90 13
1968-10-23 Acid Treatment 986.00 990.00 0
1971-07-14 Cement Plug 911.40 997.00 0
1990-10-15 Perforation 399.40 400.00 20
1990-10-15 Acid Treatment 399.40 400.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0

For data sources see[5]

References