X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174121504002

Well Details

Well ID: 0174121504002
Loading map...
Location: 00/04-15-017-12W4/2
Location Alias: 00/04-15-17-12 W4M
Location Alias 2: 00/04-15-017-12 W4/02
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 12
Section: 15
County/Municipality: County of Newell
Well Name: CARDINAL BANTRY 4-15-17-12
Operator Name: Cardinal Energy Ltd.
License Number: 0266176
License Date: 2002-01-18
License Status: Suspension
Spud Date: 2002-01-31
Final Drill Date: 2002-02-04
Well Total Depth: 989.00 m
Surface Hole Latitude: 50.427746
Surface Hole Longitude: -111.580957

For data sources see[1][2]

Well History

Date Event
2002-01-18 Obtained License
2002-01-31 Surface Casing Operation Performed
2002-02-03 Well Log Performed
2002-02-04 Finished Drilling
2002-02-04 Production Casing Operation Performed
2002-02-04 Rig Released
2002-02-04 Well Mode changed to Drilled and Cased
2002-02-08 Perforation Treatment Performed - Jet Perforation
2002-02-14 Perforation Treatment Performed - Jet Perforation
2002-02-15 Perforation Treatment Performed - Jet Perforation
2002-04-05 Well Began Production
2002-04-05 Well Fluid changed to Gas
2002-04-05 Well Mode changed to Flowing
2002-07-31 Well Fluid changed to Gas
2002-07-31 Well Mode changed to Suspended
2003-02-03 Perforation Treatment Performed - Cement Squeeze
2016-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-10-07 Plug Back Performed
2016-10-07 Well Fluid changed to Gas
2016-10-07 Well Mode changed to Abandoned Zone
2019-09-14 Well Log Performed
2019-11-25 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-02-08 Perforation 967.60 969.00 17
2002-02-14 Perforation 791.80 792.70 17
2002-02-15 Perforation 779.00 780.00 17
2003-02-03 Cement Squeeze 791.80 792.70 0
2003-02-03 Cement Squeeze 779.00 780.00 0
2016-10-07 Packing Device Capped w/Cement 950.00 958.00 0
2016-10-07 Packing Device Capped w/Cement 767.00 775.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1528 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2003-02-01 No Incident Encountered 0.00 0.00
2016-10-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References