X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174120915020

Well Details

Well ID: 0174120915020
Loading map...
Location: 02/15-09-017-12W4/0
Location Alias: 02/15-09-17-12 W4M
Location Alias 2: 02/15-09-017-12 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 12
Section: 09
County/Municipality: County of Newell
Well Name: PENGROWTH BANTRY 15-9-17-12
Operator Name: Cardinal Energy Ltd.
License Number: 0194351
License Date: 1996-11-29
License Status: Issued
Spud Date: 1996-12-13
Final Drill Date: 1996-12-17
Well Total Depth: 1012.00 m
Surface Hole Latitude: 50.424458
Surface Hole Longitude: -111.591893

For data sources see[1][2]

Well History

Date Event
1996-11-29 Obtained License
1996-12-14 Surface Casing Operation Performed
1996-12-16 Well Log Performed
1996-12-17 Finished Drilling
1996-12-17 Production Casing Operation Performed
1996-12-17 Rig Released
1996-12-17 Well Log Performed
1996-12-17 Well Mode changed to Drilled and Cased
1997-01-05 Perforation Treatment Performed - Jet Perforation
1997-01-05 Well Log Performed
1997-01-07 Well Began Production
1997-01-07 Well Fluid changed to Crude Oil
1997-01-07 Well Mode changed to Flowing
1997-02-22 Perforation Treatment Performed - Cement Squeeze
1997-02-24 Perforation Treatment Performed - Jet Perforation
1997-02-24 Well Log Performed
1997-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-12 Perforation Treatment Performed - Jet Perforation
1997-06-12 Plug Back Performed
1997-06-12 Well Log Performed
1997-10-21 Perforation Treatment Performed - Cement Squeeze
1997-10-21 Plug Back Performed
1997-10-23 Perforation Treatment Performed - Jet Perforation
1998-02-28 Well Fluid changed to Crude Oil
1998-02-28 Well Mode changed to Suspended
2001-01-12 Well Fluid changed to Crude Oil
2001-01-12 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-01-05 Perforation 972.00 974.00 13
1997-02-22 Cement Squeeze 972.00 974.00 0
1997-02-24 Perforation 974.00 976.00 13
1997-06-12 Packing Device Capped w/Cement 952.40 960.40 0
1997-06-12 Perforation 858.00 860.00 13
1997-10-21 Cement Squeeze 858.00 860.00 0
1997-10-23 Perforation 972.00 976.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 781 0.0 0.0 0.0
2001 7962 0.0 0.0 0.0
2002 8683 0.0 0.0 0.0
2003 8355 0.0 0.0 0.0
2004 8163 0.0 0.0 0.0
2005 5601 0.0 0.0 0.0
2006 7907 0.0 0.0 0.0
2007 8723 0.0 0.0 0.0
2008 8733 0.0 0.0 0.0
2009 8702 0.0 0.0 0.0
2010 8441 0.0 0.0 0.0
2011 8745 0.0 0.0 0.0
2012 8780 0.0 0.0 0.0
2013 8693 0.0 0.0 0.0
2014 8079 0.0 0.0 0.0
2015 8262 0.0 0.0 0.0
2016 7432 0.0 0.0 0.0
2017 8679 0.0 0.0 0.0
2018 8737 0.0 0.0 0.0
2019 8181 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References