X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174110210002

Well Details

Well ID: 0174110210002
Loading map...
Location: 00/10-02-017-11W4/2
Location Alias: 00/10-02-17-11 W4M
Location Alias 2: 00/10-02-017-11 W4/02
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 11
Section: 02
County/Municipality: County of Newell
Well Name: TXNE ALDSON 10-2-17-11
Operator Name: Torxen Energy Ltd.
License Number: 0043633
License Date: 1972-09-21
License Status: Issued
Spud Date: 1972-10-06
Final Drill Date: 1972-10-08
Well Total Depth: 647.70 m
Surface Hole Latitude: 50.408089
Surface Hole Longitude: -111.408164

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-09-21 Obtained License
1972-10-08 Drill Stem Test Performed
1972-10-08 Finished Drilling
1972-10-08 Well Mode changed to Drilled and Cased
1972-10-09 Production Casing Operation Performed
1972-10-28 Perforation Treatment Performed - Jet Perforation
1972-11-01 Perforation Treatment Performed - Fractured
1976-06-16 Perforation Treatment Performed - Jet Perforation
1976-06-18 Perforation Treatment Performed - Fractured
1976-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-22 Perforation Treatment Performed - Fractured
1976-06-22 Perforation Treatment Performed - Jet Perforation
1976-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-25 Perforation Treatment Performed - Fractured
1977-04-16 Well Began Production
1977-04-16 Well Fluid changed to Gas
1977-04-16 Well Mode changed to Flowing
1994-01-07 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-10-28 Perforation 333.50 336.50 3
1976-06-22 Acid Treatment 624.20 626.70 0
1976-06-22 Fracture 624.20 626.70 0
1976-06-25 Acid Treatment 416.70 423.70 0
1976-06-25 Fracture 416.70 423.70 0
1972-10-28 Perforation 349.60 352.30 3
1972-11-01 Fracture 333.50 352.30 0
1976-06-16 Perforation 313.30 314.60 7
1976-06-16 Perforation 360.00 361.20 7
1976-06-18 Fracture 313.30 361.20 0
1976-06-22 Perforation 416.70 417.90 7
1976-06-22 Perforation 422.50 423.70 7
1976-06-22 Perforation 624.20 626.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 4122 0.0 0.0 0.0
1978 6019 0.0 0.0 0.0
1979 5198 0.0 0.0 0.0
1980 4654 0.0 0.0 0.0
1981 4739 0.0 0.0 0.0
1982 2877 0.0 0.0 0.0
1983 951 0.0 0.0 0.0
1984 2830 0.0 0.0 0.0
1985 63 0.0 0.0 0.0
1986 2766 0.0 0.0 0.0
1987 3568 0.0 0.0 0.0
1988 4304 0.0 0.0 0.0
1989 3391 0.0 0.0 0.0
1990 2877 0.0 0.0 0.0
1991 1812 0.0 0.0 0.0
1992 4149 0.0 0.0 0.0
1993 3789 0.0 0.0 0.0

For data sources see[5]

References