If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0174103308002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/08-33-017-10W4/2 | |
Location Alias: 00/08-33-17-10 W4M | |
Location Alias 2: 00/08-33-017-10 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 017 | |
Meridian: 4 | |
Range: 10 | |
Section: 33 | |
County/Municipality: Cypress County | |
Well Name: PINE CLIFF ALDSON 8-33-17-10 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0119224 | |
License Date: 1985-11-13 | |
License Status: Issued | |
Spud Date: 1985-11-19 | |
Final Drill Date: 1985-11-20 | |
Well Total Depth: 710.00 m | |
Surface Hole Latitude: 50.476614 | |
Surface Hole Longitude: -111.312628 |
Date | Event |
---|---|
1985-11-13 | Obtained License |
1985-11-19 | Surface Casing Operation Performed |
1985-11-20 | Finished Drilling |
1985-11-20 | Well Mode changed to Drilled and Cased |
1985-11-21 | Production Casing Operation Performed |
1985-11-21 | Rig Released |
1985-12-01 | Well Log Performed |
1986-01-26 | Perforation Treatment Performed - Jet Perforation |
1986-02-02 | Perforation Treatment Performed - Fractured |
1986-02-04 | Perforation Treatment Performed - Jet Perforation |
1986-02-05 | Perforation Treatment Performed - Fractured |
1986-02-07 | Perforation Treatment Performed - Jet Perforation |
1986-02-10 | Perforation Treatment Performed - Fractured |
1986-04-29 | Well Began Production |
1986-04-29 | Well Fluid changed to Gas |
1986-04-29 | Well Mode changed to Flowing |
1991-12-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-01-26 | Perforation | 665.00 | 666.00 | 13 |
1986-02-07 | Perforation | 379.00 | 380.50 | 9 |
1986-02-07 | Perforation | 386.50 | 387.50 | 6 |
1986-02-07 | Perforation | 392.00 | 393.00 | 6 |
1986-02-07 | Perforation | 395.50 | 396.50 | 6 |
1986-02-07 | Perforation | 414.00 | 415.00 | 6 |
1986-02-07 | Perforation | 421.50 | 423.00 | 6 |
1986-02-10 | Fracture | 360.00 | 423.00 | 0 |
1986-01-26 | Perforation | 669.50 | 671.50 | 13 |
1986-02-02 | Fracture | 665.00 | 671.50 | 0 |
1986-02-04 | Perforation | 471.50 | 473.50 | 13 |
1986-02-04 | Perforation | 477.50 | 479.50 | 13 |
1986-02-05 | Fracture | 471.50 | 479.50 | 0 |
1986-02-07 | Perforation | 360.00 | 361.00 | 6 |
1986-02-07 | Perforation | 366.00 | 367.00 | 6 |
1986-02-07 | Perforation | 370.50 | 372.00 | 9 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 3889 | 0.0 | 0.0 | 0.0 |
1987 | 4686 | 0.0 | 0.0 | 0.0 |
1988 | 7075 | 0.0 | 0.0 | 0.0 |
1989 | 7661 | 0.0 | 0.0 | 0.0 |
1990 | 4831 | 0.0 | 0.0 | 0.0 |
1991 | 815 | 0.0 | 0.0 | 0.0 |
For data sources see[5]