X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174102616002

Well Details

Well ID: 0174102616002
Loading map...
Location: 00/16-26-017-10W4/2
Location Alias: 00/16-26-17-10 W4M
Location Alias 2: 00/16-26-017-10 W4/02
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 10
Section: 26
County/Municipality: Cypress County
Well Name: PINE CLIFF ALDSON 16-26-17-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0059171
License Date: 1976-07-15
License Status: Suspension
Spud Date: 1976-07-20
Final Drill Date: 1976-07-22
Well Total Depth: 522.10 m
Surface Hole Latitude: 50.469670
Surface Hole Longitude: -111.265410

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-07-15 Obtained License
1976-07-22 Finished Drilling
1976-07-22 Production Casing Operation Performed
1976-07-22 Well Mode changed to Drilled and Cased
1976-08-19 Perforation Treatment Performed - Fractured
1976-08-19 Perforation Treatment Performed - Jet Perforation
1976-08-20 Perforation Treatment Performed - Jet Perforation
1976-08-21 Perforation Treatment Performed - Fractured
1976-10-29 Well Began Production
1976-10-29 Well Fluid changed to Gas
1976-10-29 Well Mode changed to Flowing
1990-02-10 Well Log Performed
1993-05-01 Well Fluid changed to Gas
1993-05-01 Well Mode changed to Suspended
2000-06-23 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-19 Perforation 476.70 478.50 7
1976-08-21 Fracture 374.00 422.80 0
1976-08-19 Perforation 482.50 484.30 7
1976-08-19 Fracture 476.70 484.30 0
1976-08-20 Perforation 374.00 375.80 7
1976-08-20 Perforation 396.80 397.50 7
1976-08-20 Perforation 413.00 413.90 7
1976-08-20 Perforation 416.70 417.30 7
1976-08-20 Perforation 422.10 422.80 7
1976-08-20 Perforation 400.50 401.10 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1505 0.0 0.0 0.0
1977 6905 0.0 0.0 0.0
1978 7956 0.0 0.0 0.0
1979 8201 0.0 0.0 0.0
1980 2535 0.0 0.0 0.0
1981 6732 0.0 0.0 0.0
1982 5919 0.0 0.0 0.0
1983 5324 0.0 0.0 0.0
1984 1306 0.0 0.0 0.0
1985 5117 0.0 0.0 0.0
1986 6250 0.0 0.0 0.0
1987 6496 0.0 0.0 0.0
1988 7429 0.0 0.0 0.0
1989 7110 0.0 0.0 0.0
1990 6346 0.0 0.0 0.0
1991 5416 0.0 0.0 0.0
1992 5151 0.0 0.0 0.0
1993 2517 0.0 0.0 0.0

For data sources see[5]

References