X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174102616000

Well Details

Well ID: 0174102616000
Loading map...
Location: 00/16-26-017-10W4/0
Location Alias: 00/16-26-17-10 W4M
Location Alias 2: 00/16-26-017-10 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 10
Section: 26
County/Municipality: Cypress County
Well Name: PINE CLIFF ALDSON 16-26-17-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0059171
License Date: 1976-07-15
License Status: Suspension
Spud Date: 1976-07-20
Final Drill Date: 1976-07-22
Well Total Depth: 522.10 m
Surface Hole Latitude: 50.469670
Surface Hole Longitude: -111.265410

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-07-15 Obtained License
1976-07-22 Finished Drilling
1976-07-22 Production Casing Operation Performed
1976-07-22 Well Mode changed to Drilled and Cased
1976-08-19 Perforation Treatment Performed - Fractured
1976-08-19 Perforation Treatment Performed - Jet Perforation
1976-08-20 Perforation Treatment Performed - Jet Perforation
1976-08-21 Perforation Treatment Performed - Fractured
1976-10-29 Well Began Production
1976-10-29 Well Fluid changed to Gas
1976-10-29 Well Mode changed to Flowing
1990-02-10 Well Log Performed
2000-06-23 Well Fluid changed to Gas
2000-06-23 Well Mode changed to Flowing
2002-04-01 Well Fluid changed to Gas
2002-04-01 Well Mode changed to Suspended
2018-07-01 Well Fluid changed to Gas
2018-07-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-19 Perforation 476.70 478.50 7
1976-08-21 Fracture 374.00 422.80 0
1976-08-19 Perforation 482.50 484.30 7
1976-08-19 Fracture 476.70 484.30 0
1976-08-20 Perforation 374.00 375.80 7
1976-08-20 Perforation 396.80 397.50 7
1976-08-20 Perforation 413.00 413.90 7
1976-08-20 Perforation 416.70 417.30 7
1976-08-20 Perforation 422.10 422.80 7
1976-08-20 Perforation 400.50 401.10 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1504 0.0 0.0 0.0
1977 6903 0.0 0.0 0.0
1978 7956 0.0 0.0 0.0
1979 8301 0.0 0.0 0.0
1980 2973 0.0 0.0 0.0
1981 6749 0.0 0.0 0.0
1982 6131 0.0 0.0 0.0
1983 1135 0.0 0.0 0.0
1984 1303 0.0 0.0 0.0
1985 5367 0.0 0.0 0.0
1986 6529 0.0 0.0 0.0
1987 6288 0.0 0.0 0.0
1988 7346 0.0 0.0 0.0
1989 7258 0.0 0.0 0.0
1990 7417 0.0 0.0 0.0
1991 7149 0.0 0.0 0.0
1992 8264 0.0 0.0 0.0
1993 8161 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8752 0.0 0.0 0.0
2000 8769 0.0 0.0 0.0
2001 8637 0.0 0.0 0.0
2002 2156 0.0 0.0 0.0
2018 4416 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References