X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174102512000

Well Details

Well ID: 0174102512000
Loading map...
Location: 00/12-25-017-10W4/0
Location Alias: 00/12-25-17-10 W4M
Location Alias 2: 00/12-25-017-10 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 10
Section: 25
County/Municipality: Cypress County
Well Name: PINE CLIFF ALDSON 12-25-17-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0118591
License Date: 1985-10-24
License Status: Issued
Spud Date: 1985-11-01
Final Drill Date: 1985-11-02
Well Total Depth: 735.00 m
Surface Hole Latitude: 50.463250
Surface Hole Longitude: -111.263843

For data sources see[1][2]

Well History

Date Event
1985-10-24 Obtained License
1985-11-01 Surface Casing Operation Performed
1985-11-02 Finished Drilling
1985-11-02 Well Mode changed to Drilled and Cased
1985-11-03 Production Casing Operation Performed
1985-11-03 Rig Released
1985-11-16 Well Log Performed
1986-01-14 Perforation Treatment Performed - Jet Perforation
1986-01-15 Perforation Treatment Performed - Fractured
1986-01-21 Perforation Treatment Performed - Jet Perforation
1986-01-22 Perforation Treatment Performed - Fractured
1986-01-25 Perforation Treatment Performed - Jet Perforation
1986-01-26 Perforation Treatment Performed - Fractured
1986-01-28 Perforation Treatment Performed - Jet Perforation
1986-01-29 Perforation Treatment Performed - Fractured
1986-06-25 Well Began Production
1986-06-25 Well Fluid changed to Gas
1986-06-25 Well Mode changed to Flowing
1991-12-01 Well Fluid changed to Gas
1991-12-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-01-14 Perforation 679.00 680.00 13
1986-01-22 Fracture 488.50 498.00 0
1986-01-25 Perforation 403.50 404.50 6
1986-01-25 Perforation 410.00 411.00 6
1986-01-25 Perforation 425.00 426.50 6
1986-01-25 Perforation 435.00 436.00 6
1986-01-25 Perforation 440.00 441.00 6
1986-01-26 Fracture 403.50 441.00 0
1986-01-28 Perforation 368.50 369.50 6
1986-01-28 Perforation 374.00 375.00 6
1986-01-28 Perforation 382.50 384.00 6
1986-01-14 Perforation 681.50 683.00 13
1986-01-28 Perforation 388.50 390.00 6
1986-01-28 Perforation 397.00 398.00 6
1986-01-29 Fracture 368.50 398.00 0
1986-01-14 Perforation 687.00 689.00 13
1986-01-14 Perforation 690.50 691.50 13
1986-01-15 Fracture 679.00 691.50 0
1986-01-21 Perforation 488.50 489.50 13
1986-01-21 Perforation 491.00 492.00 13
1986-01-21 Perforation 495.00 496.00 13
1986-01-21 Perforation 497.00 498.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 3230 0.0 0.0 0.0
1987 5563 0.0 0.0 0.0
1988 5469 0.0 0.0 0.0
1989 4115 0.0 0.0 0.0
1990 3109 0.0 0.0 0.0
1991 3620 0.0 0.0 0.0
1992 8782 0.0 0.0 0.0
1993 8542 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8752 0.0 0.0 0.0
2000 8769 0.0 0.0 0.0
2001 8637 0.0 0.0 0.0
2002 8746 0.0 0.0 0.0
2003 8752 0.0 0.0 0.0
2004 8720 0.0 0.0 0.0
2005 8753 0.0 0.0 0.0
2006 8637 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8736 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References