If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0174102306002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/06-23-017-10W4/2 | |
| Location Alias: 00/06-23-17-10 W4M | |
| Location Alias 2: 00/06-23-017-10 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 017 | |
| Meridian: 4 | |
| Range: 10 | |
| Section: 23 | |
| County/Municipality: Cypress County | |
| Well Name: PINE CLIFF ALDSON 6-23-17-10 | |
| Operator Name: Pine Cliff Energy Ltd. | |
| License Number: 0054135 | |
| License Date: 1975-07-04 | |
| License Status: Issued | |
| Spud Date: 1975-07-08 | |
| Final Drill Date: 1975-07-10 | |
| Well Total Depth: 725.10 m | |
| Surface Hole Latitude: 50.447797 | |
| Surface Hole Longitude: -111.276694 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1975-07-04 | Obtained License |
| 1975-07-10 | Finished Drilling |
| 1975-07-10 | Production Casing Operation Performed |
| 1975-07-10 | Well Mode changed to Drilled and Cased |
| 1975-08-13 | Perforation Treatment Performed - Fractured |
| 1975-08-13 | Perforation Treatment Performed - Jet Perforation |
| 1975-08-18 | Perforation Treatment Performed - Fractured |
| 1975-08-18 | Perforation Treatment Performed - Jet Perforation |
| 1975-08-22 | Perforation Treatment Performed - Fractured |
| 1975-08-22 | Perforation Treatment Performed - Jet Perforation |
| 1975-12-03 | Well Began Production |
| 1975-12-03 | Well Fluid changed to Gas |
| 1975-12-03 | Well Mode changed to Flowing |
| 1978-08-31 | Perforation Treatment Performed - Jet Perforation |
| 1991-12-01 | Well Structure changed to Commingled |
| 2007-02-18 | Perforation Treatment Performed - Jet Perforation |
| 2007-04-30 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1975-08-13 | Perforation | 669.60 | 671.50 | 13 |
| 1975-08-22 | Perforation | 420.60 | 421.80 | 7 |
| 1975-08-22 | Fracture | 358.10 | 421.80 | 0 |
| 1978-08-31 | Perforation | 470.30 | 471.80 | 4 |
| 1978-08-31 | Perforation | 476.40 | 478.20 | 4 |
| 2007-02-18 | Perforation | 384.00 | 385.00 | 7 |
| 2007-04-30 | Fracture | 414.80 | 421.80 | 0 |
| 2007-04-30 | Fracture | 405.40 | 406.60 | 0 |
| 2007-04-30 | Fracture | 367.60 | 369.40 | 0 |
| 2007-04-30 | Fracture | 358.10 | 359.40 | 0 |
| 1975-08-13 | Fracture | 669.60 | 671.50 | 0 |
| 1975-08-18 | Perforation | 470.30 | 471.80 | 7 |
| 1975-08-18 | Perforation | 476.40 | 478.20 | 7 |
| 1975-08-18 | Fracture | 470.30 | 478.20 | 0 |
| 1975-08-22 | Perforation | 358.10 | 359.40 | 7 |
| 1975-08-22 | Perforation | 367.60 | 369.40 | 7 |
| 1975-08-22 | Perforation | 405.40 | 406.60 | 7 |
| 1975-08-22 | Perforation | 414.80 | 416.10 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1975 | 666 | 0.0 | 0.0 | 0.0 |
| 1976 | 8681 | 0.0 | 0.0 | 0.0 |
| 1977 | 7927 | 0.0 | 0.0 | 0.0 |
| 1978 | 8333 | 0.0 | 0.0 | 0.0 |
| 1979 | 8364 | 0.0 | 0.0 | 0.0 |
| 1980 | 3001 | 0.0 | 0.0 | 0.0 |
| 1981 | 6815 | 0.0 | 0.0 | 0.0 |
| 1982 | 5821 | 0.0 | 0.0 | 0.0 |
| 1983 | 628 | 0.0 | 0.0 | 0.0 |
| 1984 | 2916 | 0.0 | 0.0 | 0.0 |
| 1985 | 5103 | 0.0 | 0.0 | 0.0 |
| 1986 | 2437 | 0.0 | 0.0 | 0.0 |
| 1987 | 6484 | 0.0 | 0.0 | 0.0 |
| 1988 | 7568 | 0.0 | 0.0 | 0.0 |
| 1989 | 7276 | 0.0 | 0.0 | 0.0 |
| 1990 | 7500 | 0.0 | 0.0 | 0.0 |
| 1991 | 4260 | 0.0 | 0.0 | 0.0 |
For data sources see[5]