X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174101910020

Well Details

Well ID: 0174101910020
Loading map...
Location: 02/10-19-017-10W4/0
Location Alias: 02/10-19-17-10 W4M
Location Alias 2: 02/10-19-017-10 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 10
Section: 19
County/Municipality: Cypress County
Well Name: PINE CLIFF ALDSON 10-19-17-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0391648
License Date: 2008-01-11
License Status: Issued
Spud Date: 2008-02-02
Final Drill Date: 2008-02-02
Well Total Depth: 824.50 m
Surface Hole Latitude: 50.447636
Surface Hole Longitude: -111.370369

For data sources see[1][2]

Well History

Date Event
2008-01-11 Obtained License
2008-01-27 Conductor Casing Operation Performed
2008-02-02 Direction Drilling Operation Performed - Deviate
2008-02-02 Finished Drilling
2008-02-02 Well Mode changed to Drilled and Cased
2008-02-03 Production Casing Operation Performed
2008-02-03 Rig Released
2008-02-05 Well Log Performed
2008-02-11 Perforation Treatment Performed - Jet Perforation
2008-02-22 Perforation Treatment Performed - Fractured
2008-02-26 Well Began Production
2008-02-26 Well Fluid changed to Gas
2008-02-26 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-02-02 113.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-02-11 Perforation 760.00 762.00 7
2008-02-11 Perforation 381.00 382.00 7
2008-02-11 Perforation 371.00 372.00 7
2008-02-22 Fracture 760.00 762.00 0
2008-02-22 Fracture 557.00 558.00 0
2008-02-22 Fracture 476.00 477.00 0
2008-02-22 Fracture 465.00 466.00 0
2008-02-22 Fracture 452.00 453.00 0
2008-02-22 Fracture 435.00 436.00 0
2008-02-22 Fracture 415.00 416.00 0
2008-02-22 Fracture 404.00 405.00 0
2008-02-11 Perforation 557.00 558.00 7
2008-02-22 Fracture 393.00 394.00 0
2008-02-22 Fracture 381.00 382.00 0
2008-02-22 Fracture 371.00 372.00 0
2008-02-11 Perforation 476.00 477.00 7
2008-02-11 Perforation 465.00 466.00 7
2008-02-11 Perforation 452.00 453.00 7
2008-02-11 Perforation 435.00 436.00 7
2008-02-11 Perforation 415.00 416.00 7
2008-02-11 Perforation 404.00 405.00 7
2008-02-11 Perforation 393.00 394.00 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 7439 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References