X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174101606020

Well Details

Well ID: 0174101606020
Loading map...
Location: 02/06-16-017-10W4/0
Location Alias: 02/06-16-17-10 W4M
Location Alias 2: 02/06-16-017-10 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 10
Section: 16
County/Municipality: Cypress County
Well Name: PINE CLIFF ALDSON 6-16-17-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0406216
License Date: 2008-12-16
License Status: Issued
Spud Date: 2009-02-06
Final Drill Date: 2009-02-07
Well Total Depth: 753.00 m
Surface Hole Latitude: 50.429983
Surface Hole Longitude: -111.329705

For data sources see[1][2]

Well History

Date Event
2008-12-16 Obtained License
2009-02-04 Conductor Casing Operation Performed
2009-02-06 Direction Drilling Operation Performed - Deviate
2009-02-07 Finished Drilling
2009-02-07 Production Casing Operation Performed
2009-02-07 Rig Released
2009-02-07 Well Mode changed to Drilled and Cased
2009-02-14 Well Log Performed
2009-02-18 Perforation Treatment Performed - Jet Perforation
2009-02-19 Perforation Treatment Performed - Fractured
2009-02-23 Well Began Production
2009-02-23 Well Fluid changed to Gas
2009-02-23 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-02-06 69.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-18 Perforation 695.50 697.50 7
2009-02-18 Perforation 362.00 363.00 7
2009-02-19 Fracture 695.50 697.50 0
2009-02-19 Fracture 502.00 503.00 0
2009-02-19 Fracture 446.00 447.00 0
2009-02-19 Fracture 428.00 429.00 0
2009-02-19 Fracture 417.00 418.00 0
2009-02-19 Fracture 406.00 407.00 0
2009-02-19 Fracture 397.00 398.00 0
2009-02-19 Fracture 385.00 386.00 0
2009-02-19 Fracture 374.00 375.00 0
2009-02-18 Perforation 502.00 503.00 7
2009-02-19 Fracture 362.00 363.00 0
2009-02-18 Perforation 446.00 447.00 7
2009-02-18 Perforation 428.00 429.00 7
2009-02-18 Perforation 417.00 418.00 7
2009-02-18 Perforation 406.00 407.00 7
2009-02-18 Perforation 397.00 398.00 7
2009-02-18 Perforation 385.00 386.00 7
2009-02-18 Perforation 374.00 375.00 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 7487 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References