If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0174101306002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]()  | 
| Location: 00/06-13-017-10W4/2 | |
| Location Alias: 00/06-13-17-10 W4M | |
| Location Alias 2: 00/06-13-017-10 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 017 | |
| Meridian: 4 | |
| Range: 10 | |
| Section: 13 | |
| County/Municipality: Cypress County | |
| Well Name: PINE CLIFF ALDSON 6-13-17-10 | |
| Operator Name: Pine Cliff Energy Ltd. | |
| License Number: 0119557 | |
| License Date: 1985-11-22 | |
| License Status: Amended | |
| Spud Date: 1985-11-28 | |
| Final Drill Date: 1985-11-30 | |
| Well Total Depth: 697.00 m | |
| Surface Hole Latitude: 50.431027 | |
| Surface Hole Longitude: -111.253808 | 
| Date | Event | 
|---|---|
| 1985-11-22 | Obtained License | 
| 1985-11-28 | Surface Casing Operation Performed | 
| 1985-11-30 | Finished Drilling | 
| 1985-11-30 | Production Casing Operation Performed | 
| 1985-11-30 | Rig Released | 
| 1985-11-30 | Well Mode changed to Drilled and Cased | 
| 1985-12-05 | Well Log Performed | 
| 1985-12-15 | Well Log Performed | 
| 1986-01-20 | Perforation Treatment Performed - Jet Perforation | 
| 1986-01-21 | Perforation Treatment Performed - Fractured | 
| 1986-01-24 | Perforation Treatment Performed - Jet Perforation | 
| 1986-01-25 | Perforation Treatment Performed - Fractured | 
| 1986-02-08 | Perforation Treatment Performed - Jet Perforation | 
| 1986-02-09 | Perforation Treatment Performed - Fractured | 
| 1986-05-16 | Well Began Production | 
| 1986-05-16 | Well Fluid changed to Gas | 
| 1986-05-16 | Well Mode changed to Flowing | 
| 1991-12-01 | Well Structure changed to Commingled | 
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | 
|---|---|---|---|---|
| 1986-01-20 | Perforation | 637.50 | 638.50 | 13 | 
| 1986-02-08 | Perforation | 345.50 | 346.50 | 6 | 
| 1986-02-08 | Perforation | 347.50 | 348.50 | 6 | 
| 1986-02-08 | Perforation | 354.00 | 356.00 | 6 | 
| 1986-02-08 | Perforation | 359.00 | 361.00 | 6 | 
| 1986-02-08 | Perforation | 368.50 | 370.00 | 6 | 
| 1986-02-08 | Perforation | 376.50 | 377.50 | 6 | 
| 1986-02-08 | Perforation | 381.00 | 382.00 | 6 | 
| 1986-02-08 | Perforation | 386.50 | 387.50 | 6 | 
| 1986-02-08 | Perforation | 390.00 | 391.00 | 6 | 
| 1986-02-08 | Perforation | 393.00 | 394.00 | 6 | 
| 1986-01-20 | Perforation | 639.50 | 641.00 | 13 | 
| 1986-02-08 | Perforation | 399.00 | 400.00 | 6 | 
| 1986-02-09 | Fracture | 339.50 | 400.00 | 0 | 
| 1986-01-20 | Perforation | 643.00 | 644.00 | 13 | 
| 1986-01-20 | Perforation | 644.50 | 646.00 | 13 | 
| 1986-01-21 | Fracture | 637.50 | 646.00 | 0 | 
| 1986-01-24 | Perforation | 448.50 | 450.50 | 13 | 
| 1986-01-24 | Perforation | 455.00 | 457.00 | 13 | 
| 1986-01-25 | Fracture | 448.50 | 457.00 | 0 | 
| 1986-02-08 | Perforation | 339.50 | 340.50 | 6 | 
For data sources see[4]
 
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) | 
|---|---|---|---|---|
| 1986 | 2134 | 0.0 | 0.0 | 0.0 | 
| 1987 | 7177 | 0.0 | 0.0 | 0.0 | 
| 1988 | 7109 | 0.0 | 0.0 | 0.0 | 
| 1989 | 6945 | 0.0 | 0.0 | 0.0 | 
| 1990 | 6659 | 0.0 | 0.0 | 0.0 | 
| 1991 | 3840 | 0.0 | 0.0 | 0.0 | 
For data sources see[5]