If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0174100408002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/08-04-017-10W4/2 | |
Location Alias: 00/08-04-17-10 W4M | |
Location Alias 2: 00/08-04-017-10 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 017 | |
Meridian: 4 | |
Range: 10 | |
Section: 04 | |
County/Municipality: Cypress County | |
Well Name: PINE CLIFF ALDSON 8-4-17-10 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0119395 | |
License Date: 1985-11-18 | |
License Status: Issued | |
Spud Date: 1985-11-25 | |
Final Drill Date: 1985-11-27 | |
Well Total Depth: 685.00 m | |
Surface Hole Latitude: 50.404214 | |
Surface Hole Longitude: -111.311219 |
Date | Event |
---|---|
1985-11-18 | Obtained License |
1985-11-25 | Surface Casing Operation Performed |
1985-11-27 | Finished Drilling |
1985-11-27 | Production Casing Operation Performed |
1985-11-27 | Rig Released |
1985-11-27 | Well Mode changed to Drilled and Cased |
1985-12-13 | Well Log Performed |
1986-01-21 | Perforation Treatment Performed - Jet Perforation |
1986-01-24 | Perforation Treatment Performed - Fractured |
1986-01-25 | Perforation Treatment Performed - Jet Perforation |
1986-01-27 | Perforation Treatment Performed - Fractured |
1986-02-11 | Perforation Treatment Performed - Jet Perforation |
1986-02-13 | Perforation Treatment Performed - Fractured |
1986-05-16 | Well Began Production |
1986-05-16 | Well Fluid changed to Gas |
1986-05-16 | Well Mode changed to Flowing |
1991-12-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-01-21 | Perforation | 610.00 | 611.00 | 13 |
1986-02-11 | Perforation | 320.50 | 321.50 | 6 |
1986-02-11 | Perforation | 328.00 | 329.00 | 6 |
1986-02-11 | Perforation | 332.50 | 333.50 | 6 |
1986-02-11 | Perforation | 340.00 | 341.00 | 6 |
1986-02-11 | Perforation | 347.00 | 348.00 | 6 |
1986-02-11 | Perforation | 353.50 | 354.50 | 6 |
1986-02-11 | Perforation | 359.00 | 360.00 | 6 |
1986-02-11 | Perforation | 366.50 | 368.00 | 6 |
1986-02-13 | Fracture | 301.50 | 368.00 | 0 |
1986-01-21 | Perforation | 612.00 | 613.00 | 13 |
1986-01-21 | Perforation | 615.00 | 617.00 | 13 |
1986-01-24 | Fracture | 610.00 | 617.00 | 0 |
1986-01-25 | Perforation | 415.00 | 416.50 | 13 |
1986-01-25 | Perforation | 421.00 | 422.50 | 13 |
1986-01-27 | Fracture | 415.00 | 422.50 | 0 |
1986-02-11 | Perforation | 301.50 | 302.50 | 6 |
1986-02-11 | Perforation | 311.00 | 313.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 1949 | 0.0 | 0.0 | 0.0 |
1987 | 5724 | 0.0 | 0.0 | 0.0 |
1988 | 7181 | 0.0 | 0.0 | 0.0 |
1989 | 7100 | 0.0 | 0.0 | 0.0 |
1990 | 7664 | 0.0 | 0.0 | 0.0 |
1991 | 3716 | 0.0 | 0.0 | 0.0 |
For data sources see[5]