X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174100211002

Well Details

Well ID: 0174100211002
Loading map...
Location: 00/11-02-017-10W4/2
Location Alias: 00/11-02-17-10 W4M
Location Alias 2: 00/11-02-017-10 W4/02
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 10
Section: 02
County/Municipality: Cypress County
Well Name: PINE CLIFF ALDSON 11-2-17-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0046412
License Date: 1973-07-05
License Status: Issued
Spud Date: 1973-07-13
Final Drill Date: 1973-07-17
Well Total Depth: 643.40 m
Surface Hole Latitude: 50.408055
Surface Hole Longitude: -111.281624

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-07-05 Obtained License
1973-07-17 Drill Stem Test Performed
1973-07-17 Finished Drilling
1973-07-17 Well Mode changed to Drilled and Cased
1973-07-18 Production Casing Operation Performed
1973-08-02 Perforation Treatment Performed - Jet Perforation
1973-08-20 Perforation Treatment Performed - Fractured
1974-12-11 Perforation Treatment Performed - Fractured
1974-12-11 Perforation Treatment Performed - Jet Perforation
1974-12-12 Perforation Treatment Performed - Fractured
1975-03-20 Well Began Production
1975-03-20 Well Fluid changed to Gas
1975-03-20 Well Mode changed to Flowing
1978-09-18 Perforation Treatment Performed - Jet Perforation
1991-12-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-08-02 Perforation 617.20 617.50 7
1974-12-11 Perforation 318.80 320.60 7
1974-12-11 Perforation 338.90 340.20 7
1974-12-11 Perforation 355.70 356.90 7
1974-12-11 Perforation 367.00 368.20 7
1974-12-11 Perforation 374.90 376.10 7
1974-12-12 Fracture 318.80 376.10 0
1978-09-18 Perforation 421.50 423.30 7
1978-09-18 Perforation 428.20 430.00 7
1973-08-02 Perforation 618.40 618.70 7
1973-08-02 Perforation 620.30 621.50 7
1973-08-02 Perforation 622.40 623.00 7
1973-08-02 Perforation 624.80 625.40 7
1973-08-20 Fracture 617.20 625.40 0
1974-12-11 Perforation 422.50 424.30 7
1974-12-11 Perforation 428.50 430.40 7
1974-12-11 Fracture 422.50 430.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 6722 0.0 0.0 0.0
1976 8622 0.0 0.0 0.0
1977 8609 0.0 0.0 0.0
1978 7665 0.0 0.0 0.0
1979 4761 0.0 0.0 0.0
1980 6984 0.0 0.0 0.0
1981 5104 0.0 0.0 0.0
1982 5584 0.0 0.0 0.0
1983 2696 0.0 0.0 0.0
1984 5371 0.0 0.0 0.0
1985 5476 0.0 0.0 0.0
1986 2390 0.0 0.0 0.0
1987 4614 0.0 0.0 0.0
1988 6509 0.0 0.0 0.0
1989 7785 0.0 0.0 0.0
1990 6075 0.0 0.0 0.0
1991 2589 0.0 0.0 0.0

For data sources see[5]

References