X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174100206000

Well Details

Well ID: 0174100206000
Loading map...
Location: 00/06-02-017-10W4/0
Location Alias: 00/06-02-17-10 W4M
Location Alias 2: 00/06-02-017-10 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 10
Section: 02
County/Municipality: Cypress County
Well Name: PINE CLIFF ALDSON 6-2-17-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0075927
License Date: 1979-05-29
License Status: Issued
Spud Date: 1979-06-07
Final Drill Date: 1979-06-08
Well Total Depth: 472.00 m
Surface Hole Latitude: 50.402676
Surface Hole Longitude: -111.280374

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-05-29 Obtained License
1979-06-08 Finished Drilling
1979-06-08 Well Mode changed to Drilled and Cased
1979-06-09 Production Casing Operation Performed
1979-07-07 Perforation Treatment Performed - Jet Perforation
1979-07-11 Perforation Treatment Performed - Fractured
1979-07-12 Perforation Treatment Performed - Jet Perforation
1979-07-14 Perforation Treatment Performed - Fractured
1980-01-18 Well Began Production
1980-01-18 Well Fluid changed to Gas
1980-01-18 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-07 Perforation 422.50 424.00 7
1979-07-12 Perforation 340.20 340.80 7
1979-07-12 Perforation 354.50 355.40 7
1979-07-12 Perforation 356.30 356.60 7
1979-07-12 Perforation 357.30 357.60 7
1979-07-12 Perforation 361.60 362.20 7
1979-07-12 Perforation 367.60 368.20 7
1979-07-14 Fracture 320.60 368.20 0
1979-07-07 Perforation 428.60 430.10 7
1979-07-07 Perforation 440.00 440.60 7
1979-07-11 Fracture 422.50 440.60 0
1979-07-12 Perforation 320.60 321.20 7
1979-07-12 Perforation 321.80 322.70 7
1979-07-12 Perforation 327.00 327.60 7
1979-07-12 Perforation 329.90 330.50 7
1979-07-12 Perforation 333.10 333.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 6565 0.0 0.0 0.0
1981 5014 0.0 0.0 0.0
1982 4392 0.0 0.0 0.0
1983 2123 0.0 0.0 0.0
1985 602 0.0 0.0 0.0
1986 2476 0.0 0.0 0.0
1987 4614 0.0 0.0 0.0
1988 6509 0.0 0.0 0.0
1989 7066 0.0 0.0 0.0
1990 6097 0.0 0.0 0.0
1991 2733 0.0 0.0 0.0
1992 4023 0.0 0.0 0.0
1993 8045 0.0 0.0 0.0
1994 8755 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8476 0.0 0.0 0.0
2001 8116 0.0 0.0 0.0
2002 8716 0.0 0.0 0.0
2003 8662 0.0 0.0 0.0
2004 8594 0.0 0.0 0.0
2005 8753 0.0 0.0 0.0
2006 8637 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References