X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174100201000

Well Details

Well ID: 0174100201000
Loading map...
Location: 00/01-02-017-10W4/0
Location Alias: 00/01-02-17-10 W4M
Location Alias 2: 00/01-02-017-10 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 10
Section: 02
County/Municipality: Cypress County
Well Name: AMI DIAZ ALDSON 1-2-17-10
Operator Name: Anterra Energy Inc.
License Number: 0220415
License Date: 1998-12-30
License Status: Abandoned
Spud Date: 1999-01-20
Final Drill Date: 1999-01-24
Well Total Depth: 975.00 m
Surface Hole Latitude: 50.400514
Surface Hole Longitude: -111.269710

For data sources see[1][2]

Well History

Date Event
1998-12-30 Obtained License
1999-01-21 Surface Casing Operation Performed
1999-01-23 Well Log Performed
1999-01-24 Drill Stem Test Performed
1999-01-24 Finished Drilling
1999-01-25 Production Casing Operation Performed
1999-01-26 Rig Released
1999-01-26 Well Mode changed to Drilled and Cased
1999-02-03 Perforation Treatment Performed - Jet Perforation
1999-02-03 Well Log Performed
1999-02-05 Perforation Treatment Performed - Fractured
2000-03-01 Well Began Production
2000-03-01 Well Fluid changed to Gas
2000-03-01 Well Mode changed to Flowing
2001-08-29 Well Fluid changed to Gas
2001-08-29 Well Mode changed to Suspended
2005-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-30 Perforation Treatment Performed - Jet Perforation
2005-03-30 Plug Back Performed
2005-03-30 Well Fluid changed to Gas
2005-03-30 Well Mode changed to Abandoned Zone
2005-03-31 Perforation Treatment Performed - Cement Squeeze
2005-03-31 Plug Back Performed
2005-04-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-02-03 Perforation 848.00 850.50 13
1999-02-05 Fracture 848.00 850.50 0
2005-03-30 Packing Device Capped w/Cement 835.00 843.00 0
2005-03-30 Perforation 244.00 245.00 20
2005-03-31 Cement Squeeze 244.00 245.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 475 0.0 0.0 0.0

For data sources see[5]

References