If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0174100116002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/16-01-017-10W4/2 | |
Location Alias: 00/16-01-17-10 W4M | |
Location Alias 2: 00/16-01-017-10 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 017 | |
Meridian: 4 | |
Range: 10 | |
Section: 01 | |
County/Municipality: Cypress County | |
Well Name: PINE CLIFF ALDSON 16-1-17-10 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0082228 | |
License Date: 1980-04-18 | |
License Status: Issued | |
Spud Date: 1980-05-01 | |
Final Drill Date: 1980-05-02 | |
Well Total Depth: 680.00 m | |
Surface Hole Latitude: 50.411413 | |
Surface Hole Longitude: -111.242511 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-04-18 | Obtained License |
1980-05-02 | Finished Drilling |
1980-05-03 | Production Casing Operation Performed |
1980-06-18 | Perforation Treatment Performed - Jet Perforation |
1980-06-19 | Perforation Treatment Performed - Fractured |
1980-06-30 | Perforation Treatment Performed - Jet Perforation |
1980-07-01 | Perforation Treatment Performed - Fractured |
1980-07-03 | Perforation Treatment Performed - Jet Perforation |
1980-07-08 | Perforation Treatment Performed - Fractured |
1980-07-09 | Well Mode changed to Drilled and Cased |
1983-12-28 | Well Began Production |
1983-12-28 | Well Fluid changed to Gas |
1983-12-28 | Well Mode changed to Flowing |
1991-12-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-06-18 | Perforation | 634.40 | 635.90 | 20 |
1980-07-03 | Perforation | 359.00 | 359.60 | 4 |
1980-07-03 | Perforation | 369.30 | 370.00 | 4 |
1980-07-03 | Perforation | 376.30 | 377.00 | 4 |
1980-07-08 | Fracture | 333.50 | 377.00 | 0 |
1980-06-19 | Fracture | 634.40 | 635.90 | 0 |
1980-06-30 | Perforation | 438.00 | 440.00 | 6 |
1980-06-30 | Perforation | 444.00 | 446.00 | 6 |
1980-07-01 | Fracture | 438.00 | 446.00 | 0 |
1980-07-03 | Perforation | 333.50 | 335.50 | 6 |
1980-07-03 | Perforation | 342.50 | 343.50 | 6 |
1980-07-03 | Perforation | 346.00 | 346.60 | 4 |
1980-07-03 | Perforation | 354.30 | 355.00 | 4 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 63 | 0.0 | 0.0 | 0.0 |
1984 | 3514 | 0.0 | 0.0 | 0.0 |
1985 | 5345 | 0.0 | 0.0 | 0.0 |
1986 | 2402 | 0.0 | 0.0 | 0.0 |
1987 | 7177 | 0.0 | 0.0 | 0.0 |
1988 | 7109 | 0.0 | 0.0 | 0.0 |
1989 | 6847 | 0.0 | 0.0 | 0.0 |
1990 | 6681 | 0.0 | 0.0 | 0.0 |
1991 | 5298 | 0.0 | 0.0 | 0.0 |
For data sources see[5]