If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0174092008002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/08-20-017-09W4/2 | |
Location Alias: 00/08-20-17-09 W4M | |
Location Alias 2: 00/08-20-017-09 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 017 | |
Meridian: 4 | |
Range: 09 | |
Section: 20 | |
County/Municipality: Cypress County | |
Well Name: PINE CLIFF ALDSON 8-20-17-9 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0118759 | |
License Date: 1985-10-30 | |
License Status: Issued | |
Spud Date: 1985-11-06 | |
Final Drill Date: 1985-11-07 | |
Well Total Depth: 680.00 m | |
Surface Hole Latitude: 50.447761 | |
Surface Hole Longitude: -111.196701 |
Date | Event |
---|---|
1985-10-30 | Obtained License |
1985-11-06 | Surface Casing Operation Performed |
1985-11-07 | Finished Drilling |
1985-11-07 | Production Casing Operation Performed |
1985-11-07 | Rig Released |
1985-11-07 | Well Mode changed to Drilled and Cased |
1985-11-16 | Well Log Performed |
1985-12-02 | Well Log Performed |
1986-01-16 | Perforation Treatment Performed - Jet Perforation |
1986-01-17 | Perforation Treatment Performed - Fractured |
1986-01-21 | Perforation Treatment Performed - Jet Perforation |
1986-01-22 | Perforation Treatment Performed - Fractured |
1986-02-03 | Perforation Treatment Performed - Jet Perforation |
1986-02-04 | Perforation Treatment Performed - Fractured |
1986-04-03 | Well Began Production |
1986-04-03 | Well Fluid changed to Gas |
1986-04-03 | Well Mode changed to Flowing |
1991-12-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-01-16 | Perforation | 630.50 | 632.50 | 13 |
1986-02-03 | Perforation | 344.00 | 345.00 | 6 |
1986-02-03 | Perforation | 347.50 | 348.50 | 6 |
1986-02-03 | Perforation | 361.50 | 362.50 | 6 |
1986-02-03 | Perforation | 366.50 | 367.50 | 6 |
1986-02-03 | Perforation | 374.50 | 375.50 | 6 |
1986-02-03 | Perforation | 380.50 | 381.50 | 6 |
1986-02-03 | Perforation | 386.00 | 387.50 | 6 |
1986-02-03 | Perforation | 392.50 | 393.50 | 6 |
1986-02-04 | Fracture | 319.50 | 393.50 | 0 |
1986-01-16 | Perforation | 635.50 | 637.00 | 13 |
1986-01-17 | Fracture | 630.50 | 637.00 | 0 |
1986-01-21 | Perforation | 442.00 | 444.00 | 13 |
1986-01-21 | Perforation | 448.50 | 450.50 | 13 |
1986-01-22 | Fracture | 442.00 | 450.50 | 0 |
1986-02-03 | Perforation | 319.50 | 320.50 | 6 |
1986-02-03 | Perforation | 328.50 | 330.50 | 6 |
1986-02-03 | Perforation | 339.00 | 341.00 | 6 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 4572 | 0.0 | 0.0 | 0.0 |
1987 | 5360 | 0.0 | 0.0 | 0.0 |
1988 | 7520 | 0.0 | 0.0 | 0.0 |
1989 | 3981 | 0.0 | 0.0 | 0.0 |
For data sources see[5]