X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174092006000

Well Details

Well ID: 0174092006000
Loading map...
Location: 00/06-20-017-09W4/0
Location Alias: 00/06-20-17-09 W4M
Location Alias 2: 00/06-20-017-09 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 09
Section: 20
County/Municipality: Cypress County
Well Name: PINE CLIFF ALDSON 6-20-17-9
Operator Name: Pine Cliff Energy Ltd.
License Number: 0069875
License Date: 1978-06-02
License Status: Issued
Spud Date: 1978-06-30
Final Drill Date: 1978-07-01
Well Total Depth: 683.00 m
Surface Hole Latitude: 50.447745
Surface Hole Longitude: -111.207988

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-06-02 Obtained License
1978-07-01 Finished Drilling
1978-07-01 Production Casing Operation Performed
1978-07-01 Well Mode changed to Drilled and Cased
1978-09-12 Perforation Treatment Performed - Jet Perforation
1978-09-22 Perforation Treatment Performed - Fractured
1978-09-23 Perforation Treatment Performed - Jet Perforation
1978-09-25 Perforation Treatment Performed - Fractured
1978-09-26 Perforation Treatment Performed - Jet Perforation
1978-09-29 Perforation Treatment Performed - Fractured
1979-04-01 Well Began Production
1979-04-01 Well Fluid changed to Gas
1979-04-01 Well Mode changed to Flowing
1991-12-01 Well Fluid changed to Gas
1991-12-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-09-12 Perforation 633.30 634.50 6
1978-09-26 Perforation 361.50 362.00 6
1978-09-26 Perforation 378.00 378.50 6
1978-09-26 Perforation 384.50 385.50 6
1978-09-26 Perforation 389.50 390.50 6
1978-09-26 Perforation 395.00 396.00 6
1978-09-29 Fracture 331.50 396.00 0
1978-09-12 Perforation 638.80 640.80 6
1978-09-22 Fracture 633.30 640.80 0
1978-09-23 Perforation 444.50 446.00 6
1978-09-23 Perforation 451.50 453.00 6
1978-09-25 Fracture 444.50 453.00 0
1978-09-26 Perforation 331.50 332.00 6
1978-09-26 Perforation 342.50 343.50 6
1978-09-26 Perforation 351.00 351.50 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 7524 0.0 0.0 0.0
1980 2488 0.0 0.0 0.0
1981 5884 0.0 0.0 0.0
1982 5836 0.0 0.0 0.0
1983 2909 0.0 0.0 0.0
1985 997 0.0 0.0 0.0
1986 1481 0.0 0.0 0.0
1987 4112 0.0 0.0 0.0
1988 6950 0.0 0.0 0.0
1989 3533 0.0 0.0 0.0
1990 4485 0.0 0.0 0.0
1991 8424 0.0 0.0 0.0
1992 8589 0.0 0.0 0.0
1993 8249 0.0 0.0 0.0
1994 8756 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8753 0.0 0.0 0.0
2000 8773 0.0 0.0 0.0
2001 8613 0.0 0.0 0.0
2002 8746 0.0 0.0 0.0
2003 8752 0.0 0.0 0.0
2004 8702 0.0 0.0 0.0
2005 8753 0.0 0.0 0.0
2006 8637 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References