X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0174091606000

Well Details

Well ID: 0174091606000
Loading map...
Location: 00/06-16-017-09W4/0
Location Alias: 00/06-16-17-09 W4M
Location Alias 2: 00/06-16-017-09 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 09
Section: 16
County/Municipality: Cypress County
Well Name: PINE CLIFF ALDSON 6-16-17-9
Operator Name: Pine Cliff Energy Ltd.
License Number: 0083293
License Date: 1980-06-06
License Status: Issued
Spud Date: 1980-06-10
Final Drill Date: 1980-06-14
Well Total Depth: 1016.00 m
Surface Hole Latitude: 50.432760
Surface Hole Longitude: -111.187353

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-06-06 Obtained License
1980-06-12 Drill Stem Test Performed
1980-06-14 Finished Drilling
1980-06-15 Production Casing Operation Performed
1980-07-26 Perforation Treatment Performed - Jet Perforation
1980-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-25 Perforation Treatment Performed - Jet Perforation
1980-09-26 Perforation Treatment Performed - Fractured
1980-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-13 Well Mode changed to Drilled and Cased
1986-01-29 Perforation Treatment Performed - Fractured
1986-01-29 Perforation Treatment Performed - Jet Perforation
1986-02-06 Perforation Treatment Performed - Jet Perforation
1986-02-07 Perforation Treatment Performed - Fractured
1986-05-16 Well Began Production
1986-05-16 Well Fluid changed to Gas
1986-05-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-26 Perforation 761.20 762.50 6
1986-01-29 Fracture 446.50 464.90 0
1986-02-06 Perforation 333.70 334.40 6
1986-02-06 Perforation 343.00 344.50 6
1986-02-06 Perforation 362.00 362.60 6
1986-02-06 Perforation 366.30 367.00 6
1986-02-06 Perforation 373.50 374.20 6
1986-02-06 Perforation 385.00 385.70 6
1986-02-06 Perforation 394.00 395.00 6
1986-02-06 Perforation 397.00 398.00 6
1986-02-07 Fracture 333.70 398.00 0
1980-09-25 Packing Device Capped w/Cement 755.00 755.00 0
1980-09-25 Perforation 525.00 526.50 7
1980-09-25 Perforation 527.50 529.00 7
1980-09-26 Fracture 525.00 529.00 0
1980-11-13 Packing Device Capped w/Cement 500.00 500.00 0
1986-01-29 Perforation 446.50 448.00 13
1986-01-29 Perforation 453.00 455.00 13
1986-01-29 Perforation 463.90 464.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1894 0.0 0.0 0.0
1987 6487 0.0 0.0 0.0
1988 7109 0.0 0.0 0.0
1989 6945 0.0 0.0 0.0
1990 6681 0.0 0.0 0.0
1991 6084 0.0 0.0 0.0
1992 6166 0.0 0.0 0.0
1993 8074 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 7902 0.0 0.0 0.0
2001 8557 0.0 0.0 0.0
2002 2901 0.0 0.0 0.0
2003 8692 0.0 0.0 0.0
2004 8614 0.0 0.0 0.0
2005 8753 0.0 0.0 0.0
2006 8637 0.0 0.0 0.0
2007 5567 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References