X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164293312000

Well Details

Well ID: 0164293312000
Loading map...
Location: 00/12-33-016-29W4/0
Location Alias: 00/12-33-16-29 W4M
Location Alias 2: 00/12-33-016-29 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 29
Section: 33
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: LTAM HIR 12-33-16-29
Operator Name: Long Term Asset Management Inc.
License Number: 0238564
License Date: 2000-06-15
License Status: Amended
Spud Date: 2000-06-24
Final Drill Date: 2000-07-27
Well Total Depth: 2840.00 m
Surface Hole Latitude: 50.389800
Surface Hole Longitude: -113.941494

For data sources see[1][2]

Well History

Date Event
2000-06-15 Obtained License
2000-06-28 Surface Casing Operation Performed
2000-07-07 Direction Drilling Operation Performed - Deviate
2000-07-26 Well Log Performed
2000-07-27 Finished Drilling
2000-07-28 Production Casing Operation Performed
2000-07-30 Rig Released
2000-07-30 Well Mode changed to Drilled and Cased
2000-09-09 Perforation Treatment Performed - Jet Perforation
2000-09-09 Well Log Performed
2000-09-12 Perforation Treatment Performed - Fractured
2000-09-18 Well Log Performed
2000-09-27 Perforation Treatment Performed - Jet Perforation
2000-09-27 Well Mode changed to Drilled and Cased
2000-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-12-21 Well Began Production
2000-12-21 Well Fluid changed to Gas
2000-12-21 Well Mode changed to Flowing
2019-06-01 Well Fluid changed to Gas
2019-06-01 Well Mode changed to Suspended
2020-02-12 Well Fluid changed to Gas
2020-02-12 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-07-07 1604.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-09-09 Perforation 2718.00 2720.00 17
2000-09-09 Perforation 2709.00 2710.00 17
2000-09-09 Perforation 2711.00 2715.00 17
2000-09-12 Fracture 2709.00 2720.00 0
2000-09-27 Perforation 2752.00 2755.00 14
2000-09-28 Acid Treatment 2752.00 2755.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 247 0.0 0.0 0.0
2001 8612 0.0 0.0 0.0
2002 7939 0.0 0.0 0.0
2003 7988 0.0 0.0 0.0
2004 8504 0.0 0.0 0.0
2005 8539 0.0 0.0 0.0
2006 8390 0.0 0.0 0.0
2007 6880 0.0 0.0 0.0
2008 4032 0.0 0.0 0.0
2009 6145 0.0 0.0 0.0
2010 8639 0.0 0.0 0.0
2011 8255 0.0 0.0 0.0
2012 8636 0.0 0.0 0.0
2013 7112 0.0 0.0 0.0
2014 7045 0.0 0.0 0.0
2015 2504 0.0 0.0 0.0
2016 1255 0.0 0.0 0.0
2020 504 0.0 0.0 0.0

For data sources see[6]

References