X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164293310000

Well Details

Well ID: 0164293310000
Loading map...
Location: 00/10-33-016-29W4/0
Location Alias: 00/10-33-16-29 W4M
Location Alias 2: 00/10-33-016-29 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 29
Section: 33
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: MOBIL COMPTON HOOKER 10-33-16-29
Operator Name: Lexin Resources Ltd.
License Number: 0221070
License Date: 1999-01-29
License Status: Suspension
Spud Date: 1999-02-05
Final Drill Date: 1999-03-06
Well Total Depth: 2773.00 m
Surface Hole Latitude: 50.392538
Surface Hole Longitude: -113.928035

For data sources see[1][2]

Well History

Date Event
1999-01-29 Obtained License
1999-02-28 Surface Casing Operation Performed
1999-03-06 Finished Drilling
1999-03-06 Well Log Performed
1999-03-07 Drill Stem Test Performed
1999-03-08 Drill Stem Test Performed
1999-03-09 Drill Stem Test Performed
1999-03-10 Drill Stem Test Performed
1999-03-14 Production Casing Operation Performed
1999-03-15 Rig Released
1999-03-15 Well Mode changed to Drilled and Cased
1999-03-21 Well Log Performed
1999-03-22 Perforation Treatment Performed - Jet Perforation
1999-03-22 Well Log Performed
1999-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-27 Perforation Treatment Performed - Jet Perforation
1999-03-27 Well Log Performed
1999-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-04-22 Well Log Performed
1999-05-13 Perforation Treatment Performed - Fractured
1999-05-13 Perforation Treatment Performed - Jet Perforation
1999-05-13 Well Log Performed
1999-05-13 Well Mode changed to Drilled and Cased
1999-10-14 Well Began Production
1999-10-14 Well Fluid changed to Gas
1999-10-14 Well Mode changed to Flowing
2000-10-04 Well Log Performed
2003-06-01 Well Fluid changed to Gas
2003-06-01 Well Mode changed to Suspended
2004-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-19 Plug Back Performed
2004-09-21 Perforation Treatment Performed - Cement Squeeze
2004-09-21 Plug Back Performed
2004-09-22 Perforation Treatment Performed - Jet Perforation
2004-09-24 Perforation Treatment Performed - Jet Perforation
2004-09-24 Well Log Performed
2004-09-27 Perforation Treatment Performed - Fractured
2004-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-30 Plug Back Performed
2004-10-01 Perforation Treatment Performed - Jet Perforation
2004-10-02 Perforation Treatment Performed - Fractured
2004-10-05 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-22 Perforation 2693.00 2694.00 17
1999-05-13 Fracture 2282.50 2284.50 0
2004-09-19 Packing Device Capped w/Cement 2659.00 2667.00 0
2004-09-21 Cement Squeeze 2282.50 2284.50 0
2004-09-22 Perforation 2282.50 2284.50 17
2004-09-24 Perforation 2623.00 2625.00 17
2004-09-27 Fracture 2623.00 2625.00 0
2004-09-30 Packing Device Capped w/Cement 2602.00 2610.00 0
2004-10-01 Perforation 1417.50 1418.50 14
2004-10-01 Perforation 1407.50 1411.50 14
2004-10-02 Fracture 1417.50 1418.50 0
1999-03-22 Perforation 2695.50 2696.50 17
2004-10-05 Perforation 1318.00 1320.00 14
2004-10-05 Perforation 1312.50 1314.50 14
1999-03-22 Perforation 2697.50 2698.50 17
1999-03-24 Acid Treatment 2693.00 2698.50 0
1999-03-27 Perforation 2688.00 2690.00 17
1999-03-27 Perforation 2681.00 2684.00 17
1999-03-27 Perforation 2674.00 2675.00 17
1999-03-30 Acid Treatment 2674.00 2690.00 0
1999-05-13 Perforation 2282.50 2284.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 1974 0.0 0.0 0.0
2000 3262 0.0 0.0 0.0

For data sources see[5]

References