X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164292213000

Well Details

Well ID: 0164292213000
Loading map...
Location: 00/13-22-016-29W4/0
Location Alias: 00/13-22-16-29 W4M
Location Alias 2: 00/13-22-016-29 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 29
Section: 22
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: COMPTON HOOKER 13-22-16-29
Operator Name: Lexin Resources Ltd.
License Number: 0223773
License Date: 1999-06-18
License Status: RecCertified
Spud Date: 1999-06-24
Final Drill Date: 1999-07-16
Well Total Depth: 2859.00 m
Surface Hole Latitude: 50.362287
Surface Hole Longitude: -113.920422

For data sources see[1][2]

Well History

Date Event
1999-06-18 Obtained License
1999-06-25 Surface Casing Operation Performed
1999-06-26 Direction Drilling Operation Performed - Deviate
1999-07-16 Finished Drilling
1999-07-18 Well Log Performed
1999-07-21 Well Log Performed
1999-07-23 Production Casing Operation Performed
1999-07-23 Rig Released
1999-07-23 Well Mode changed to Drilled and Cased
1999-07-28 Well Log Performed
1999-07-29 Perforation Treatment Performed - Jet Perforation
1999-07-29 Well Log Performed
1999-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-07-31 Perforation Treatment Performed - Jet Perforation
1999-07-31 Well Log Performed
1999-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-01 Perforation Treatment Performed - Jet Perforation
1999-09-01 Well Log Performed
1999-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-26 Well Log Performed
2000-04-21 Perforation Treatment Performed - Jet Perforation
2000-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-22 Well Began Production
2001-06-22 Well Fluid changed to Crude Oil
2001-06-22 Well Mode changed to Flowing
2003-06-28 Perforation Treatment Performed - Jet Perforation
2003-06-28 Well Log Performed
2003-07-01 Perforation Treatment Performed - Fractured
2004-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-24 Plug Back Performed
2004-09-24 Well Fluid changed to Crude Oil
2004-09-24 Well Log Performed
2004-09-24 Well Mode changed to Abandoned Zone
2004-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-25 Perforation Treatment Performed - Jet Perforation
2004-09-25 Perforation Treatment Performed - Remedial Casing
2004-09-25 Plug Back Performed
2004-09-25 Well Log Performed
2004-10-01 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-06-26 588.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-07-29 Perforation 2800.00 2802.00 17
2003-06-28 Perforation 2722.00 2725.50 17
2003-07-01 Fracture 2722.00 2725.50 0
2004-09-24 Packing Device Capped w/Cement 2750.80 2758.80 0
2004-09-24 Packing Device Capped w/Cement 2707.00 2715.00 0
2004-09-25 Perforation 850.00 851.00 14
2004-09-25 Remedial Casing Cementing 850.00 851.00 0
2004-09-25 Packing Device Capped w/Cement 837.00 846.00 0
1999-07-30 Acid Treatment 2800.00 2802.00 0
1999-07-31 Perforation 2773.00 2775.00 17
1999-08-01 Acid Treatment 2773.00 2775.00 0
1999-09-01 Perforation 2775.80 2777.00 13
1999-09-02 Acid Treatment 2772.00 2777.00 0
2000-04-21 Perforation 2779.50 2781.00 17
2000-04-21 Perforation 2781.00 2782.00 17
2000-04-22 Acid Treatment 2773.00 2782.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 2241 0.0 0.0 0.0

For data sources see[6]

References