X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164280910003

Well Details

Well ID: 0164280910003
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Location: 00/10-09-016-28W4/3
Location Alias: 00/10-09-16-28 W4M
Location Alias 2: 00/10-09-016-28 W4/03
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 28
Section: 09
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: COMPTON SILVER 10-9-16-28
Operator Name: Lexin Resources Ltd.
License Number: 0240902
License Date: 2000-08-15
License Status: Suspension
Spud Date: 2000-08-22
Final Drill Date: 2000-09-24
Well Total Depth: 2595.00 m
Surface Hole Latitude: 50.331153
Surface Hole Longitude: -113.792132

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2000-09-06 1845.00 Deviate (5 - 79 degrees)

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-10-12 Perforation 2526.50 2527.50 13
2003-08-23 Perforation 1286.00 1290.00 14
2003-08-25 Fracture 1286.00 1294.00 0
2003-08-28 Perforation 1239.00 1242.00 14
2003-09-02 Fracture 1239.00 1242.00 0
2014-11-18 Packing Device Capped w/Cement 1274.00 1282.00 0
2014-11-19 Packing Device Capped w/Cement 1225.00 1233.00 0
2019-08-25 Perforation 600.00 601.00 13
2019-08-26 Cement Squeeze 600.00 601.00 0
2019-08-26 Packing Device Capped w/Cement 578.00 595.00 0
2019-08-26 Perforation 549.00 550.00 13
2000-10-12 Acid Treatment 2526.50 2527.50 0
2019-08-26 Cement Squeeze 549.00 550.00 0
2019-08-26 Packing Device Capped w/Cement 533.00 545.00 0
2000-10-15 Cement Squeeze 2526.50 2527.50 0
2000-10-21 Perforation 2523.00 2525.00 14
2000-10-22 Perforation 2517.00 2519.00 14
2000-10-23 Acid Treatment 2517.00 2525.00 0
2000-10-28 Packing Device Capped w/Cement 2519.50 2522.70 0
2003-08-21 Packing Device Capped w/Cement 2503.00 2511.00 0
2003-08-23 Perforation 1291.00 1294.00 14

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-18 No Incident Encountered 0.00 0.00
2014-11-19 No Incident Encountered 0.00 0.00
2019-08-26 No Incident Encountered 0.00 0.00

For data sources see[5]

References

BESbswy