X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164271006000

Well Details

Well ID: 0164271006000
Loading map...
Location: 00/06-10-016-27W4/0
Location Alias: 00/06-10-16-27 W4M
Location Alias 2: 00/06-10-016-27 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 27
Section: 10
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: CNRL CONNEMRA 6-10-16-27
Operator Name: Canadian Natural Resources Limited
License Number: 0078956
License Date: 1979-10-31
License Status: RecCertified
Spud Date: 1979-11-03
Final Drill Date: 1979-12-08
Well Total Depth: 2382.00 m
Surface Hole Latitude: 50.331116
Surface Hole Longitude: -113.637422

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-10-31 Obtained License
1979-12-06 Drill Stem Test Performed
1979-12-08 Finished Drilling
1979-12-09 Well Log Performed
1979-12-10 Drill Stem Test Performed
1979-12-13 Production Casing Operation Performed
1979-12-13 Well Mode changed to Drilled and Cased
1979-12-17 Perforation Treatment Performed - Jet Perforation
1979-12-18 Perforation Treatment Performed - Acid Wash - No Pressure
1979-12-18 Perforation Treatment Performed - Fractured
2001-02-21 Well Began Production
2001-02-21 Well Fluid changed to Gas
2001-02-21 Well Mode changed to Flowing
2001-10-01 Well Fluid changed to Gas
2001-10-01 Well Mode changed to Suspended
2012-06-08 Well Log Performed
2012-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-09 Perforation Treatment Performed - Jet Perforation
2012-06-09 Perforation Treatment Performed - Remedial Casing
2012-06-09 Plug Back Performed
2012-06-09 Well Fluid changed to Gas
2012-06-09 Well Mode changed to Abandoned Zone
2012-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-17 Perforation Treatment Performed - Jet Perforation
2012-06-20 Perforation Treatment Performed - Jet Perforation
2012-06-22 Perforation Treatment Performed - Remedial Casing
2012-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-03 Perforation Treatment Performed - Jet Perforation
2012-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-04 Perforation Treatment Performed - Jet Perforation
2012-07-04 Perforation Treatment Performed - Remedial Casing
2012-07-04 Well Log Performed
2012-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-06 Perforation Treatment Performed - Remedial Casing
2012-07-07 Perforation Treatment Performed - Jet Perforation
2012-07-07 Well Log Performed
2012-07-08 Perforation Treatment Performed - Cement Plug
2012-07-08 Perforation Treatment Performed - Remedial Casing
2012-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-09 Perforation Treatment Performed - Jet Perforation
2012-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-10 Perforation Treatment Performed - Remedial Casing
2012-08-14 Well Abandoned
2012-08-14 Well Fluid changed to Gas
2012-08-14 Well Mode changed to Abandoned
2012-09-07 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-17 Perforation 2268.00 2277.50 7
2012-06-17 Perforation 1359.00 1360.00 17
2012-06-20 Perforation 1330.00 1331.00 17
2012-06-22 Remedial Casing Cementing 1330.00 1331.00 0
2012-06-24 Packing Device Capped w/Cement 1316.00 1324.00 0
2012-07-03 Perforation 993.00 994.00 17
2012-07-04 Remedial Casing Cementing 993.00 994.00 0
2012-07-04 Packing Device Capped w/Cement 979.00 987.00 0
2012-07-04 Perforation 599.00 600.00 17
2012-07-06 Remedial Casing Cementing 599.00 600.00 0
2012-07-06 Packing Device Capped w/Cement 585.00 594.00 0
1979-12-18 Acid Wash 2268.00 2277.50 0
2012-07-07 Perforation 540.00 541.00 17
2012-07-07 Perforation 480.00 481.00 17
2012-07-08 Remedial Casing Cementing 480.00 541.00 0
2012-07-08 Cement Plug 410.00 515.00 0
2012-07-09 Perforation 400.00 401.00 17
2012-07-09 Packing Device Capped w/Cement 387.00 395.00 0
2012-07-09 Perforation 245.00 246.00 17
2012-07-10 Remedial Casing Cementing 245.00 246.00 0
2012-07-10 Packing Device Capped w/Cement 225.00 235.00 0
1979-12-18 Fracture 2268.00 2277.50 0
2012-06-09 Packing Device Capped w/Cement 2241.00 2249.00 0
2012-06-09 Perforation 1520.00 1521.00 17
2012-06-09 Remedial Casing Cementing 1520.00 1521.00 0
2012-06-16 Packing Device Capped w/Cement 1504.00 1513.00 0
2012-06-17 Perforation 1461.00 1462.00 17
2012-06-17 Packing Device Capped w/Cement 1449.00 1457.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4362 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References