X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164270406003

Well Details

Well ID: 0164270406003
Loading map...
Location: 00/06-04-016-27W4/3
Location Alias: 00/06-04-16-27 W4M
Location Alias 2: 00/06-04-016-27 W4/03
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 27
Section: 04
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: COMPTON COMARA 6-4-16-27
Operator Name: Lexin Resources Ltd.
License Number: 0010331
License Date: 1955-10-18
License Status: Issued
Spud Date: 1955-10-22
Final Drill Date: 1997-01-26
Well Total Depth: 2854.00 m
Surface Hole Latitude: 50.315427
Surface Hole Longitude: -113.658681

For data sources see[1][2]

Well History

Date Event
1955-10-18 Obtained License
1956-01-29 Production Casing Operation Performed
1956-02-03 Perforation Treatment Performed - Abrasa-Jet Perforation
1956-02-04 Perforation Treatment Performed - Cement Squeeze
1956-02-06 Perforation Treatment Performed - Bullet Perforation
1956-02-06 Perforation Treatment Performed - Cement Squeeze
1956-02-07 Perforation Treatment Performed - Bullet Perforation
1956-02-08 Perforation Treatment Performed - Cement Squeeze
1956-02-09 Perforation Treatment Performed - Bullet Perforation
1956-02-15 Perforation Treatment Performed - Acid Wash - No Pressure
1956-02-23 Perforation Treatment Performed - Cement Squeeze
1956-02-26 Perforation Treatment Performed - Bullet Perforation
1956-02-27 Perforation Treatment Performed - Acid Wash - No Pressure
1956-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-03-03 Perforation Treatment Performed - Cement Squeeze
1956-03-04 Perforation Treatment Performed - Bullet Perforation
1956-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-08 Perforation Treatment Performed - Cement Squeeze
1993-10-15 Perforation Treatment Performed - Jet Perforation
1993-10-21 Perforation Treatment Performed - Jet Perforation
1996-07-04 Perforation Treatment Performed - Jet Perforation
1996-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-08 Perforation Treatment Performed - Jet Perforation
1996-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-13 Perforation Treatment Performed - Cement Squeeze
1997-01-13 Plug Back Performed
1997-01-15 Well Log Performed
1997-01-26 Finished Drilling
1997-01-26 Liner Casing Operation Performed
1997-01-26 Perforation Treatment Performed - Cement Squeeze
1997-02-01 Perforation Treatment Performed - Jet Perforation
1997-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-01 Well Log Performed
1997-08-02 Perforation Treatment Performed - Fractured
1997-08-02 Perforation Treatment Performed - Jet Perforation
1997-08-11 Perforation Treatment Performed - Jet Perforation
1997-08-18 Perforation Treatment Performed - Fractured
1997-08-23 Well Mode changed to Drilled and Cased
1997-10-21 Rig Released
1998-04-16 Well Began Production
1998-04-16 Well Fluid changed to Gas
1998-04-16 Well Mode changed to Flowing
1998-09-26 Perforation Treatment Performed - Jet Perforation
1999-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-03-10 Perforation Treatment Performed - Cement Squeeze
2002-04-02 Perforation Treatment Performed - Cement Plug
2002-04-02 Plug Back Performed
2019-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-07-27 Plug Back Performed
2019-07-27 Well Fluid changed to Gas
2019-07-27 Well Log Performed
2019-07-27 Well Mode changed to Abandoned Zone
2019-07-28 Perforation Treatment Performed - Cement Plug
2019-07-28 Perforation Treatment Performed - Jet Perforation
2019-07-28 Plug Back Performed
2019-07-28 Well Log Performed
2019-07-29 Perforation Treatment Performed - Abrasa-Jet Perforation
2019-07-29 Perforation Treatment Performed - Cement Plug
2019-07-29 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-02-03 Hydra Jet Perforation 2302.80 2302.80 0
1956-02-26 Bullet Perforation 2296.70 2298.20 13
1956-02-27 Acid Wash 2296.70 2298.20 0
1956-02-28 Acid Treatment 2296.70 2298.20 0
1956-03-03 Cement Squeeze 2296.70 2298.20 0
1956-03-04 Bullet Perforation 2283.00 2290.60 13
1956-03-05 Acid Treatment 2283.00 2290.60 0
1993-10-08 Acid Treatment 2283.00 2290.60 0
1993-10-08 Cement Squeeze 2283.00 2290.60 0
1993-10-15 Perforation 2318.30 2322.30 18
1993-10-21 Perforation 2302.50 2307.90 18
1956-02-04 Cement Squeeze 2302.80 2302.80 0
1996-07-04 Perforation 2297.30 2299.10 13
1996-07-05 Acid Treatment 2297.30 2299.10 0
1996-07-08 Perforation 2298.20 2300.90 13
1996-07-09 Acid Treatment 2297.30 2300.90 0
1997-01-13 Cement Squeeze 2297.30 2300.90 0
1997-01-26 Cement Squeeze 2302.50 2322.30 0
1997-02-01 Perforation 2788.00 2793.00 13
1997-02-01 Perforation 2810.00 2815.00 13
1997-02-01 Perforation 2816.00 2822.00 13
1997-02-02 Acid Treatment 2788.00 2822.00 0
1956-02-06 Bullet Perforation 2300.90 2301.20 13
1997-08-02 Perforation 2280.30 2290.60 13
1997-08-02 Perforation 2297.10 2301.80 13
1997-08-02 Fracture 2280.30 2301.80 0
1997-08-11 Perforation 2210.50 2221.50 13
1997-08-18 Fracture 2210.50 2221.50 0
1998-09-26 Perforation 2315.90 2318.30 13
1998-09-26 Perforation 2290.20 2296.40 13
1999-01-21 Acid Treatment 2290.20 2318.30 0
2001-03-10 Cement Squeeze 2315.90 2318.00 0
2002-04-02 Cement Plug 2296.50 2301.50 0
1956-02-06 Cement Squeeze 2300.90 2301.20 0
2019-07-27 Packing Device Capped w/Cement 2237.00 2245.00 0
2019-07-27 Packing Device Capped w/Cement 2197.00 2205.00 0
2019-07-28 Perforation 1488.00 1489.00 17
2019-07-28 Perforation 1327.00 1328.00 17
2019-07-28 Perforation 1279.50 1280.50 17
2019-07-28 Cement Plug 1264.50 1504.00 0
2019-07-29 Hydra Jet Perforation 603.00 603.20 0
2019-07-29 Hydra Jet Perforation 366.00 366.20 0
2019-07-29 Hydra Jet Perforation 335.00 355.20 0
2019-07-29 Hydra Jet Perforation 216.00 216.20 0
1956-02-07 Bullet Perforation 2301.20 2301.50 13
2019-07-29 Cement Plug 117.50 618.90 0
1956-02-08 Cement Squeeze 2301.20 2301.50 0
1956-02-09 Bullet Perforation 2297.30 2299.10 13
1956-02-15 Acid Wash 2297.30 2299.10 0
1956-02-23 Cement Squeeze 2297.30 2299.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 5345 0.0 0.0 0.0
1999 7517 0.0 0.0 0.0
2000 8235 0.0 0.0 0.0
2001 8623 0.0 0.0 0.0
2002 5710 0.0 0.0 0.0
2003 7610 0.0 0.0 0.0
2004 8256 0.0 0.0 0.0
2005 8616 0.0 0.0 0.0
2006 8590 0.0 0.0 0.0
2007 8104 0.0 0.0 0.0
2008 8578 0.0 0.0 0.0
2009 8581 0.0 0.0 0.0
2010 8394 0.0 0.0 0.0
2011 7703 0.0 0.0 0.0
2012 7917 0.0 0.0 0.0
2013 7785 0.0 0.0 0.0
2014 7868 0.0 0.0 0.0
2015 4438 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-07-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References