X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164201607002

Well Details

Well ID: 0164201607002
Loading map...
Location: 00/07-16-016-20W4/2
Location Alias: 00/07-16-16-20 W4M
Location Alias 2: 00/07-16-016-20 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 20
Section: 16
County/Municipality: Vulcan County
Well Name: SLE LONGCO 7-16-16-20
Operator Name: SanLing Energy Ltd.
License Number: 0214775
License Date: 1998-04-28
License Status: Issued
Spud Date: 1998-06-22
Final Drill Date: 1998-06-27
Well Total Depth: 1331.00 m
Surface Hole Latitude: 50.343687
Surface Hole Longitude: -112.694282

For data sources see[1][2]

Well History

Date Event
1998-04-28 Obtained License
1998-06-23 Surface Casing Operation Performed
1998-06-26 Drill Stem Test Performed
1998-06-26 Well Log Performed
1998-06-27 Drill Stem Test Performed
1998-06-27 Finished Drilling
1998-06-27 Well Mode changed to Drilled and Cased
1998-06-28 Production Casing Operation Performed
1998-06-28 Rig Released
1998-07-19 Well Log Performed
1998-07-21 Perforation Treatment Performed - Jet Perforation
1998-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-22 Well Log Performed
1999-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-23 Plug Back Performed
1999-03-24 Perforation Treatment Performed - Jet Perforation
1999-03-24 Well Mode changed to Drilled and Cased
1999-07-20 Well Began Production
1999-07-20 Well Fluid changed to Gas
1999-07-20 Well Mode changed to Flowing
1999-07-21 Well Fluid changed to Crude Oil
1999-07-21 Well Mode changed to Pumping
2002-12-02 Perforation Treatment Performed - Jet Perforation
2002-12-02 Well Log Performed
2019-10-01 Well Fluid changed to Crude Oil
2019-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-07-21 Perforation 1310.00 1315.00 13
1998-07-23 Acid Treatment 1310.00 1315.00 0
1999-03-23 Packing Device Capped w/Cement 1300.00 1308.00 0
1999-03-24 Perforation 1289.50 1291.50 13
2002-12-02 Perforation 1291.50 1293.50 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 3240 0.0 0.0 0.0
2000 8445 0.0 0.0 0.0
2001 5008 0.0 0.0 0.0
2002 668 0.0 0.0 0.0
2003 8582 0.0 0.0 0.0
2004 8158 0.0 0.0 0.0
2005 8398 0.0 0.0 0.0
2006 8011 0.0 0.0 0.0
2007 7039 0.0 0.0 0.0
2008 8660 0.0 0.0 0.0
2009 7334 0.0 0.0 0.0
2010 6844 0.0 0.0 0.0
2011 8112 0.0 0.0 0.0
2012 8234 0.0 0.0 0.0
2013 8365 0.0 0.0 0.0
2014 4195 0.0 0.0 0.0
2015 7597 0.0 0.0 0.0
2016 8558 0.0 0.0 0.0
2017 7721 0.0 0.0 0.0
2018 1854 0.0 0.0 0.0

For data sources see[5]

References