X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164191506002

Well Details

Well ID: 0164191506002
Loading map...
Location: 00/06-15-016-19W4/2
Location Alias: 00/06-15-16-19 W4M
Location Alias 2: 00/06-15-016-19 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 19
Section: 15
County/Municipality: Vulcan County
Well Name: CNRL ARMADA 6-15-16-19
Operator Name: Canadian Natural Resources Limited
License Number: 0109591
License Date: 1984-10-01
License Status: Issued
Spud Date: 1984-10-02
Final Drill Date: 1984-10-07
Well Total Depth: 1245.00 m
Surface Hole Latitude: 50.343702
Surface Hole Longitude: -112.537328

For data sources see[1][2]

Well History

Date Event
1984-10-01 Obtained License
1984-10-03 Surface Casing Operation Performed
1984-10-07 Drill Stem Test Performed
1984-10-07 Finished Drilling
1984-10-07 Well Log Performed
1984-10-07 Well Mode changed to Drilled and Cased
1984-10-08 Drill Stem Test Performed
1984-10-09 Drill Stem Test Performed
1984-10-10 Production Casing Operation Performed
1984-10-11 Rig Released
1985-05-01 Perforation Treatment Performed - Jet Perforation
1985-05-01 Well Log Performed
1985-05-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-05-09 Perforation Treatment Performed - Jet Perforation
1985-05-09 Plug Back Performed
1985-05-09 Well Log Performed
1990-03-08 Perforation Treatment Performed - Cement Squeeze
1990-03-08 Plug Back Performed
1990-03-14 Perforation Treatment Performed - Jet Perforation
1990-03-17 Perforation Treatment Performed - Fractured
1991-11-06 Well Began Production
1991-11-06 Well Fluid changed to Gas
1991-11-06 Well Mode changed to Flowing
2004-10-01 Well Fluid changed to Gas
2004-10-01 Well Mode changed to Suspended
2006-02-09 Well Fluid changed to Gas
2006-02-09 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-05-01 Perforation 1196.00 1202.00 13
1985-05-09 Packing Device Capped w/Cement 1182.00 1190.00 0
1985-05-09 Perforation 985.00 987.50 13
1990-03-08 Cement Squeeze 985.00 987.50 0
1990-03-14 Perforation 1196.00 1202.00 13
1990-03-17 Fracture 1196.00 1202.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 792 0.0 0.0 0.0
1992 4622 0.0 0.0 0.0
1993 8519 0.0 0.0 0.0
1994 6551 0.0 0.0 0.0
1997 7393 0.0 0.0 0.0
1998 8599 0.0 0.0 0.0
1999 8520 0.0 0.0 0.0
2000 8305 0.0 0.0 0.0
2001 7883 0.0 0.0 0.0
2002 1914 0.0 0.0 0.0
2003 24 0.0 0.0 0.0
2006 7929 0.0 0.0 0.0
2007 8625 0.0 0.0 0.0
2008 8618 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8752 0.0 0.0 0.0
2011 8422 0.0 0.0 0.0
2012 8579 0.0 0.0 0.0
2013 7096 0.0 0.0 0.0
2014 4262 0.0 0.0 0.0
2015 8524 0.0 0.0 0.0
2016 5855 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References