X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164163010004

Well Details

Well ID: 0164163010004
Loading map...
Location: 00/10-30-016-16W4/4
Location Alias: 00/10-30-16-16 W4M
Location Alias 2: 00/10-30-016-16 W4/04
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 16
Section: 30
County/Municipality: Vulcan County
Well Name: SLE ENCHANT 10-30-16-16
Operator Name: SanLing Energy Ltd.
License Number: 0039626
License Date: 1971-01-25
License Status: Abandoned
Spud Date: 1971-01-27
Final Drill Date: 1971-02-05
Well Total Depth: 1088.10 m
Surface Hole Latitude: 50.378359
Surface Hole Longitude: -112.188061

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-01-25 Obtained License
1971-01-30 Drill Stem Test Performed
1971-02-04 Drill Stem Test Performed
1971-02-05 Finished Drilling
1971-02-05 Production Casing Operation Performed
1971-02-27 Perforation Treatment Performed - Jet Perforation
1971-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-03-05 Perforation Treatment Performed - Jet Perforation
1974-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-04 Perforation Treatment Performed - Cement Squeeze
1974-06-05 Perforation Treatment Performed - Jet Perforation
1975-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-21 Perforation Treatment Performed - Cement Squeeze
1976-09-22 Perforation Treatment Performed - Jet Perforation
1976-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-28 Perforation Treatment Performed - Cement Squeeze
1979-02-02 Perforation Treatment Performed - Jet Perforation
1979-02-05 Perforation Treatment Performed - Jet Perforation
1979-02-05 Well Mode changed to Drilled and Cased
1989-01-01 Well Mode changed to Drilled and Cased
1989-12-07 Perforation Treatment Performed - Jet Perforation
1989-12-08 Perforation Treatment Performed - Fractured
1992-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-08-29 Plug Back Performed
1992-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-08-30 Plug Back Performed
1992-08-30 Well Abandoned
1992-08-30 Well Mode changed to Abandoned
1992-09-10 Well Log Performed
1992-09-14 Perforation Treatment Performed - Jet Perforation
1992-09-14 Perforation Treatment Performed - Remedial Casing
1992-09-15 Perforation Treatment Performed - Jet Perforation
1992-09-16 Perforation Treatment Performed - Remedial Casing
1992-09-22 Perforation Treatment Performed - Jet Perforation
1992-09-23 Perforation Treatment Performed - Remedial Casing
1999-04-26 Well Log Performed
1999-04-27 Perforation Treatment Performed - Jet Perforation
1999-04-27 Well Log Performed
1999-04-29 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-02-27 Perforation 1045.20 1050.30 7
1976-09-22 Perforation 863.20 865.00 7
1976-09-23 Acid Treatment 863.20 865.00 0
1979-01-28 Cement Squeeze 863.20 865.00 0
1979-02-02 Perforation 1021.10 1023.50 7
1979-02-02 Perforation 1025.30 1027.20 7
1979-02-05 Perforation 796.70 797.00 13
1989-12-07 Perforation 1021.10 1023.50 13
1989-12-07 Perforation 1025.30 1027.20 13
1989-12-08 Fracture 1021.10 1027.20 0
1992-08-29 Packing Device Capped w/Cement 1005.00 1013.00 0
1971-03-01 Acid Treatment 1045.20 1050.30 0
1992-08-30 Packing Device Capped w/Cement 777.00 785.00 0
1992-09-14 Perforation 285.00 285.50 7
1992-09-14 Remedial Casing Cementing 285.00 285.50 0
1992-09-15 Perforation 205.00 207.00 13
1992-09-16 Remedial Casing Cementing 205.00 207.00 0
1992-09-22 Perforation 240.00 241.00 26
1992-09-23 Remedial Casing Cementing 240.00 241.00 0
1999-04-27 Perforation 145.00 146.00 13
1999-04-29 Remedial Casing Cementing 145.00 146.00 0
1971-03-05 Perforation 850.40 853.40 7
1974-06-04 Acid Treatment 850.40 853.40 0
1974-06-04 Cement Squeeze 850.40 853.40 0
1974-06-05 Perforation 851.00 852.80 7
1975-07-02 Acid Treatment 851.00 852.80 0
1976-09-21 Acid Treatment 851.00 852.80 0
1976-09-21 Cement Squeeze 851.00 852.80 0

For data sources see[4]



References