X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164152404000

Well Details

Well ID: 0164152404000
Loading map...
Location: 00/04-24-016-15W4/0
Location Alias: 00/04-24-16-15 W4M
Location Alias 2: 00/04-24-016-15 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 15
Section: 24
County/Municipality: County of Newell
Well Name: TXNE JOHNSON 4-24-16-15
Operator Name: Torxen Energy Ltd.
License Number: 0092900
License Date: 1981-10-23
License Status: Suspension
Spud Date: 1981-11-10
Final Drill Date: 1981-11-14
Well Total Depth: 1079.00 m
Surface Hole Latitude: 50.356893
Surface Hole Longitude: -111.951013

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-10-23 Obtained License
1981-11-14 Finished Drilling
1981-11-15 Drill Stem Test Performed
1981-11-16 Production Casing Operation Performed
1982-03-08 Perforation Treatment Performed - Jet Perforation
1982-03-10 Perforation Treatment Performed - Fractured
1983-03-07 Well Mode changed to Drilled and Cased
1984-01-17 Perforation Treatment Performed - Jet Perforation
1984-01-19 Well Log Performed
1984-01-23 Perforation Treatment Performed - Casing Patch (Over Perfs)
1985-06-14 Well Began Injection
1985-06-14 Well Fluid changed to Water
1985-06-14 Well Type changed to Injection
1987-09-16 Perforation Treatment Performed - Jet Perforation
1987-09-16 Well Log Performed
1989-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-24 Perforation Treatment Performed - Chemical Squeeze
1997-05-25 Perforation Treatment Performed - Acid Wash - No Pressure
2008-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-02-08 Well Fluid changed to Water
2016-02-08 Well Mode changed to Suspended
2016-02-08 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-03-08 Perforation 1023.90 1025.00 7
1982-03-10 Fracture 1023.90 1025.00 0
1984-01-17 Perforation 1040.00 1042.50 13
1984-01-23 Casing Patch 1022.00 1027.00 0
1987-09-16 Perforation 1040.00 1042.50 13
1989-09-26 Acid Treatment 1040.00 1042.50 0
1997-05-24 Chemical Squeeze 1023.90 1042.50 0
1997-05-25 Acid Wash 1023.90 1042.50 0
2008-02-07 Acid Treatment 1040.00 1042.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-08-17 No Incident Encountered 0.00 0.00
2015-10-01 No Incident Encountered 0.00 0.00
2016-02-09 No Incident Encountered 0.00 0.00
2016-03-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References