X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164151104000

Well Details

Well ID: 0164151104000
Loading map...
Location: 00/04-11-016-15W4/0
Location Alias: 00/04-11-16-15 W4M
Location Alias 2: 00/04-11-016-15 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 15
Section: 11
County/Municipality: County of Newell
Well Name: TXNE ALDSON 4-11-16-15
Operator Name: Torxen Energy Ltd.
License Number: 0075935
License Date: 1979-05-29
License Status: Abandoned
Spud Date: 1979-06-01
Final Drill Date: 1979-06-08
Well Total Depth: 1071.50 m
Surface Hole Latitude: 50.327674
Surface Hole Longitude: -111.972688

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-05-29 Obtained License
1979-06-08 Finished Drilling
1979-06-08 Well Mode changed to Drilled and Cased
1979-06-09 Production Casing Operation Performed
1979-06-29 Perforation Treatment Performed - Jet Perforation
1979-06-29 Well Began Production
1979-06-29 Well Fluid changed to Crude Oil
1979-06-29 Well Mode changed to Flowing
1979-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-22 Perforation Treatment Performed - Cement Squeeze
1979-07-24 Perforation Treatment Performed - Jet Perforation
1980-12-13 Perforation Treatment Performed - Jet Perforation
1980-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-13 Perforation Treatment Performed - Cement Squeeze
1981-02-18 Perforation Treatment Performed - Jet Perforation
1982-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-10-06 Perforation Treatment Performed - Jet Perforation
1982-10-06 Well Fluid changed to Crude Oil
1982-10-06 Well Mode changed to Abandoned Zone
1997-03-23 Perforation Treatment Performed - Jet Perforation
1999-07-14 Perforation Treatment Performed - Jet Perforation
1999-07-15 Well Log Performed
2016-05-25 Well Log Performed
2016-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-05-27 Plug Back Performed
2016-05-27 Well Log Performed
2016-05-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-06-29 Perforation 1028.50 1029.50 7
1981-02-18 Perforation 1028.60 1029.40 0
1982-10-05 Packing Device Capped w/Cement 1010.00 1018.00 0
1982-10-06 Perforation 772.00 780.00 13
1982-10-06 Perforation 788.50 790.00 13
1982-10-06 Perforation 848.00 857.00 13
1997-03-23 Perforation 772.00 782.00 13
1997-03-23 Perforation 788.50 790.50 13
1997-03-23 Perforation 848.00 857.00 13
1999-07-14 Perforation 814.00 817.00 14
2016-05-27 Packing Device Capped w/Cement 257.00 265.00 0
1979-06-29 Perforation 1040.00 1040.30 3
2016-05-27 Packing Device Capped w/Cement 751.00 759.00 0
1979-07-22 Acid Treatment 1040.00 1040.30 0
1979-07-22 Cement Squeeze 1028.50 1040.30 0
1979-07-24 Perforation 1029.50 1030.00 6
1980-12-13 Perforation 1032.00 1033.00 13
1980-12-14 Acid Treatment 1032.00 1033.00 0
1981-02-13 Acid Treatment 1029.50 1030.00 0
1981-02-13 Cement Squeeze 1029.50 1030.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 4083 0.0 0.0 0.0
1980 4903 0.0 0.0 0.0
1981 2257 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-05-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References