X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164151001020

Well Details

Well ID: 0164151001020
Loading map...
Location: 02/01-10-016-15W4/0
Location Alias: 02/01-10-16-15 W4M
Location Alias 2: 02/01-10-016-15 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 15
Section: 10
County/Municipality: County of Newell
Well Name: TXNE ET AL ALDSON 1-10-16-15
Operator Name: Torxen Energy Ltd.
License Number: 0128008
License Date: 1987-08-20
License Status: Suspension
Spud Date: 1988-07-05
Final Drill Date: 1988-07-09
Well Total Depth: 1090.00 m
Surface Hole Latitude: 50.324892
Surface Hole Longitude: -111.979144

For data sources see[1][2]

Well History

Date Event
1987-08-20 Obtained License
1988-07-06 Surface Casing Operation Performed
1988-07-09 Finished Drilling
1988-07-09 Well Log Performed
1988-07-09 Well Mode changed to Drilled and Cased
1988-07-10 Production Casing Operation Performed
1988-07-10 Rig Released
1988-08-17 Well Log Performed
1988-08-19 Well Log Performed
1988-08-20 Perforation Treatment Performed - Jet Perforation
1988-10-01 Well Began Production
1988-10-01 Well Fluid changed to Crude Oil
1988-10-01 Well Mode changed to Pumping
1992-05-13 Well Log Performed
1992-05-19 Perforation Treatment Performed - Chemical Squeeze
1992-05-19 Well Log Performed
1992-11-08 Well Fluid changed to Crude Oil
1992-11-08 Well Mode changed to Suspended
1997-05-11 Perforation Treatment Performed - Jet Perforation
1997-05-13 Well Fluid changed to Crude Oil
1997-05-13 Well Mode changed to Pumping
1999-11-01 Well Fluid changed to Crude Oil
1999-11-01 Well Mode changed to Suspended
2008-04-17 Well Fluid changed to Crude Oil
2008-04-17 Well Mode changed to Pumping
2017-02-23 Well Fluid changed to Crude Oil
2017-02-23 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-08-20 Perforation 1027.70 1028.20 13
1988-08-20 Perforation 1030.00 1030.50 13
1992-05-19 Chemical Squeeze 1027.70 1030.50 0
1997-05-11 Perforation 1025.00 1028.00 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 2197 0.0 0.0 0.0
1989 7733 0.0 0.0 0.0
1990 1743 0.0 0.0 0.0
1992 1451 0.0 0.0 0.0
1997 5043 0.0 0.0 0.0
1998 4419 0.0 0.0 0.0
2008 5174 0.0 0.0 0.0
2009 8718 0.0 0.0 0.0
2010 8043 0.0 0.0 0.0
2011 8537 0.0 0.0 0.0
2012 8126 0.0 0.0 0.0
2013 6655 0.0 0.0 0.0

For data sources see[5]

References