X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164150214002

Well Details

Well ID: 0164150214002
Loading map...
Location: 00/14-02-016-15W4/2
Location Alias: 00/14-02-16-15 W4M
Location Alias 2: 00/14-02-016-15 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 15
Section: 02
County/Municipality: County of Newell
Well Name: TXNE ALDSON 14-2-16-15
Operator Name: Torxen Energy Ltd.
License Number: 0073106
License Date: 1978-11-22
License Status: Suspension
Spud Date: 1978-11-23
Final Drill Date: 1978-12-02
Well Total Depth: 1079.00 m
Surface Hole Latitude: 50.324074
Surface Hole Longitude: -111.968307

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-11-22 Obtained License
1978-11-29 Drill Stem Test Performed
1978-11-30 Drill Stem Test Performed
1978-12-02 Finished Drilling
1978-12-02 Well Mode changed to Drilled and Cased
1978-12-03 Drill Stem Test Performed
1978-12-04 Production Casing Operation Performed
1979-05-18 Perforation Treatment Performed - Jet Perforation
1979-05-26 Perforation Treatment Performed - Fractured
1993-02-23 Perforation Treatment Performed - Jet Perforation
1993-02-23 Well Log Performed
1993-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-02 Perforation Treatment Performed - Cement Squeeze
1993-03-24 Well Began Production
1993-03-24 Well Fluid changed to Crude Oil
1993-03-24 Well Mode changed to Pumping
1993-12-13 Well Fluid changed to Crude Oil
1993-12-13 Well Mode changed to Suspended
2006-12-16 Well Log Performed
2017-06-25 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-05-18 Perforation 1017.00 1018.50 7
1979-05-18 Perforation 1019.50 1021.50 7
1979-05-18 Perforation 1023.00 1024.00 7
1979-05-26 Fracture 1017.00 1024.00 0
1993-02-23 Perforation 1057.00 1061.00 13
1993-03-01 Acid Treatment 1017.00 1020.00 0
1993-03-02 Cement Squeeze 1017.00 1024.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5104 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-07-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References