X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164150210020

Well Details

Well ID: 0164150210020
Loading map...
Location: 02/10-02-016-15W4/0
Location Alias: 02/10-02-16-15 W4M
Location Alias 2: 02/10-02-016-15 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 15
Section: 02
County/Municipality: County of Newell
Well Name: TXNE 102 ALDSON 10-2-16-15
Operator Name: Torxen Energy Ltd.
License Number: 0174372
License Date: 1994-12-19
License Status: Abandoned
Spud Date: 1995-01-05
Final Drill Date: 1995-01-09
Well Total Depth: 1085.00 m
Surface Hole Latitude: 50.318974
Surface Hole Longitude: -111.959574

For data sources see[1][2]

Well History

Date Event
1994-12-19 Obtained License
1995-01-06 Surface Casing Operation Performed
1995-01-09 Finished Drilling
1995-01-09 Well Log Performed
1995-01-09 Well Mode changed to Drilled and Cased
1995-01-10 Production Casing Operation Performed
1995-01-10 Rig Released
1995-01-10 Well Log Performed
1995-02-03 Well Log Performed
1995-02-04 Perforation Treatment Performed - Jet Perforation
1995-02-04 Well Began Production
1995-02-04 Well Fluid changed to Crude Oil
1995-02-04 Well Mode changed to Pumping
1995-02-06 Well Fluid changed to Crude Oil
1995-02-06 Well Mode changed to Suspended
1995-05-22 Well Fluid changed to Crude Oil
1995-05-22 Well Mode changed to Pumping
1997-02-03 Perforation Treatment Performed - Jet Perforation
1997-02-03 Well Log Performed
1997-07-01 Well Fluid changed to Crude Oil
1997-07-01 Well Mode changed to Suspended
2007-11-27 Well Type changed to Observation
2007-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-21 Plug Back Performed
2007-12-21 Well Log Performed
2007-12-21 Well Mode changed to Abandoned Zone
2007-12-21 Well Type changed to Observation
2014-06-25 Well Abandoned
2014-06-25 Well Mode changed to Abandoned
2014-06-25 Well Type changed to Observation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-02-04 Perforation 1022.50 1023.00 13
1997-02-03 Perforation 1021.00 1022.50 13
2007-12-21 Packing Device Capped w/Cement 1006.80 1014.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4084 0.0 0.0 0.0
1996 6011 0.0 0.0 0.0
1997 3229 0.0 0.0 0.0

For data sources see[5]

References