X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164131604000

Well Details

Well ID: 0164131604000
Loading map...
Location: 00/04-16-016-13W4/0
Location Alias: 00/04-16-16-13 W4M
Location Alias 2: 00/04-16-016-13 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 13
Section: 16
County/Municipality: County of Newell
Well Name: SLE ALDSON 4-16-16-13
Operator Name: SanLing Energy Ltd.
License Number: 0023123
License Date: 1962-10-09
License Status: Abandoned
Spud Date: 1962-10-11
Final Drill Date: 1962-10-16
Well Total Depth: 1015.00 m
Surface Hole Latitude: 50.341160
Surface Hole Longitude: -111.742867

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-10-09 Obtained License
1962-10-14 Drill Stem Test Performed
1962-10-16 Finished Drilling
1962-10-17 Drill Stem Test Performed
1962-10-18 Production Casing Operation Performed
1962-10-25 Perforation Treatment Performed - Jet Perforation
1962-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-26 Perforation Treatment Performed - Fractured
1962-11-07 Perforation Treatment Performed - Cement Squeeze
1962-11-11 Perforation Treatment Performed - Jet Perforation
1962-11-12 Perforation Treatment Performed - Acid Wash - No Pressure
1962-11-26 Well Mode changed to Drilled and Cased
1963-02-21 Perforation Treatment Performed - Cement Squeeze
1963-02-21 Perforation Treatment Performed - Jet Perforation
1963-02-24 Perforation Treatment Performed - Jet Perforation
1963-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-01-03 Well Began Injection
1966-01-03 Well Fluid changed to Water
1966-01-03 Well Type changed to Disposal
1975-07-01 Perforation Treatment Performed - Condensate Squeeze
1975-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-07-12 Perforation Treatment Performed - Jet Perforation
1986-10-08 Perforation Treatment Performed - Jet Perforation
1986-10-09 Perforation Treatment Performed - Remedial Casing
1986-10-10 Perforation Treatment Performed - Jet Perforation
1986-10-11 Perforation Treatment Performed - Jet Perforation
1986-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-16 Perforation Treatment Performed - Remedial Casing
1986-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-19 Perforation Treatment Performed - Remedial Casing
1992-01-02 Perforation Treatment Performed - Cement Plug
1992-01-02 Plug Back Performed
1992-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-01-06 Plug Back Performed
1992-01-07 Perforation Treatment Performed - Cement Plug
1992-01-07 Plug Back Performed
1992-01-07 Well Abandoned
1992-01-07 Well Fluid changed to Water
1992-01-07 Well Mode changed to Abandoned
1992-01-07 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-10-25 Perforation 998.50 998.80 13
1963-02-21 Cement Squeeze 998.50 1008.90 0
1963-02-24 Perforation 998.50 1001.00 13
1963-02-25 Acid Treatment 998.50 1001.00 0
1975-07-01 Condensate Squeeze 998.50 1001.00 0
1975-07-12 Perforation 980.80 983.90 7
1975-07-12 Perforation 990.60 991.80 7
1975-07-12 Acid Treatment 980.80 991.80 0
1986-10-08 Perforation 365.00 366.00 13
1986-10-09 Remedial Casing Cementing 365.00 366.00 0
1986-10-10 Perforation 271.00 272.00 13
1962-10-25 Perforation 999.10 1001.00 13
1986-10-11 Perforation 182.00 183.00 13
1986-10-13 Acid Treatment 182.00 183.00 0
1986-10-16 Remedial Casing Cementing 182.00 183.00 0
1986-10-18 Acid Treatment 271.00 272.00 0
1986-10-19 Remedial Casing Cementing 271.00 272.00 0
1992-01-02 Cement Plug 760.00 939.50 0
1992-01-06 Packing Device Capped w/Cement 165.00 376.00 0
1992-01-07 Cement Plug 18.00 165.00 0
1962-10-26 Acid Treatment 998.50 1001.00 0
1962-10-26 Fracture 998.50 1001.00 0
1962-11-07 Cement Squeeze 998.50 1001.00 0
1962-11-11 Perforation 998.50 998.80 13
1962-11-11 Perforation 999.10 1001.00 13
1962-11-12 Acid Wash 998.50 1001.00 0
1963-02-21 Perforation 1008.30 1008.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0

For data sources see[5]

References