X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164130806000

Well Details

Well ID: 0164130806000
Loading map...
Location: 00/06-08-016-13W4/0
Location Alias: 00/06-08-16-13 W4M
Location Alias 2: 00/06-08-016-13 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 13
Section: 08
County/Municipality: County of Newell
Well Name: CVE ALDSON 6-8-16-13
Operator Name: Cenovus Energy Inc.
License Number: 0107268
License Date: 1984-05-24
License Status: RecCertified
Spud Date: 1984-07-10
Final Drill Date: 1984-07-13
Well Total Depth: 1014.00 m
Surface Hole Latitude: 50.331334
Surface Hole Longitude: -111.760516

For data sources see[1][2]

Well History

Date Event
1984-05-24 Obtained License
1984-07-11 Surface Casing Operation Performed
1984-07-13 Finished Drilling
1984-07-13 Well Mode changed to Drilled and Cased
1984-07-14 Drill Stem Test Performed
1984-07-14 Well Log Performed
1984-07-15 Drill Stem Test Performed
1984-07-16 Production Casing Operation Performed
1984-07-17 Rig Released
1984-09-05 Well Log Performed
1984-09-13 Perforation Treatment Performed - Abrasa-Jet Perforation
1984-09-13 Well Log Performed
1984-10-19 Well Began Production
1984-10-19 Well Fluid changed to Crude Oil
1984-10-19 Well Mode changed to Pumping
2003-11-01 Well Fluid changed to Crude Oil
2003-11-01 Well Mode changed to Suspended
2005-05-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-05 Plug Back Performed
2005-05-05 Well Fluid changed to Crude Oil
2005-05-05 Well Mode changed to Abandoned Zone
2005-05-06 Well Log Performed
2006-06-06 Perforation Treatment Performed - Jet Perforation
2006-06-06 Perforation Treatment Performed - Remedial Casing
2006-06-07 Perforation Treatment Performed - Cement Plug
2006-06-09 Perforation Treatment Performed - Jet Perforation
2006-06-09 Perforation Treatment Performed - Remedial Casing
2006-06-10 Perforation Treatment Performed - Cement Plug
2006-10-16 Well Log Performed
2006-11-03 Perforation Treatment Performed - Jet Perforation
2006-11-03 Perforation Treatment Performed - Remedial Casing
2006-11-04 Perforation Treatment Performed - Cement Plug
2006-12-19 Well Abandoned
2006-12-19 Well Fluid changed to Crude Oil
2006-12-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-09-13 Hydra Jet Perforation 982.00 983.50 0
2006-11-03 Remedial Casing Cementing 200.00 204.00 0
2006-11-04 Cement Plug 107.00 212.00 0
2005-05-05 Packing Device Capped w/Cement 967.00 975.00 0
2006-06-06 Perforation 400.00 404.00 1
2006-06-06 Remedial Casing Cementing 400.00 404.00 0
2006-06-07 Cement Plug 352.80 412.00 0
2006-06-09 Perforation 275.00 280.00 1
2006-06-09 Remedial Casing Cementing 275.00 280.00 0
2006-06-10 Cement Plug 229.00 283.00 0
2006-11-03 Perforation 200.00 204.00 1

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1552 0.0 0.0 0.0
1985 8137 0.0 0.0 0.0
1986 8657 0.0 0.0 0.0
1987 8495 0.0 0.0 0.0
1988 8609 0.0 0.0 0.0
1989 8731 0.0 0.0 0.0
1990 8513 0.0 0.0 0.0
1991 8703 0.0 0.0 0.0
1992 8669 0.0 0.0 0.0
1993 8743 0.0 0.0 0.0
1994 8655 0.0 0.0 0.0
1995 8676 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8739 0.0 0.0 0.0
1998 8735 0.0 0.0 0.0
1999 8613 0.0 0.0 0.0
2000 8754 0.0 0.0 0.0
2001 6262 0.0 0.0 0.0
2002 5960 0.0 0.0 0.0
2003 3766 0.0 0.0 0.0

For data sources see[5]

References