X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164122814000

Well Details

Well ID: 0164122814000
Loading map...
Location: 00/14-28-016-12W4/0
Location Alias: 00/14-28-16-12 W4M
Location Alias 2: 00/14-28-016-12 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 12
Section: 28
County/Municipality: County of Newell
Well Name: CARDINAL BANTRY 14-28-16-12
Operator Name: Cardinal Energy Ltd.
License Number: 0105364
License Date: 1984-01-18
License Status: Issued
Spud Date: 1984-01-20
Final Drill Date: 1984-01-24
Well Total Depth: 1031.50 m
Surface Hole Latitude: 50.382665
Surface Hole Longitude: -111.602169

For data sources see[1][2]

Well History

Date Event
1984-01-18 Obtained License
1984-01-24 Finished Drilling
1984-01-24 Well Mode changed to Drilled and Cased
1984-01-25 Drill Stem Test Performed
1984-01-25 Well Log Performed
1984-01-26 Drill Stem Test Performed
1984-01-27 Production Casing Operation Performed
1984-02-03 Well Log Performed
1984-02-04 Perforation Treatment Performed - Jet Perforation
1984-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-02-07 Perforation Treatment Performed - Jet Perforation
1984-02-07 Plug Back Performed
1984-02-16 Well Log Performed
1984-04-14 Well Began Production
1984-04-14 Well Fluid changed to Crude Oil
1984-04-14 Well Mode changed to Pumping
1988-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-30 Perforation Treatment Performed - Cement Squeeze
1988-09-30 Plug Back Performed
1988-09-30 Well Fluid changed to Crude Oil
1988-09-30 Well Mode changed to Abandoned Zone
1988-10-01 Well Log Performed
1988-10-02 Perforation Treatment Performed - Jet Perforation
2005-12-17 Well Log Performed
2005-12-18 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-02-04 Perforation 1008.50 1015.00 13
1984-02-04 Perforation 1005.50 1007.00 13
1984-02-06 Acid Treatment 1005.50 1015.00 0
1984-02-07 Packing Device Capped w/Cement 993.00 1003.00 0
1984-02-07 Perforation 965.50 968.50 13
1984-02-07 Perforation 957.50 961.00 13
1988-05-31 Acid Treatment 957.50 968.50 0
1988-09-30 Cement Squeeze 957.50 968.50 0
1988-10-02 Perforation 981.00 986.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 6433 0.0 0.0 0.0
1985 8635 0.0 0.0 0.0
1986 7326 0.0 0.0 0.0
1987 8007 0.0 0.0 0.0
1988 6406 0.0 0.0 0.0

For data sources see[5]

References