X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164121603000

Well Details

Well ID: 0164121603000
Loading map...
Location: 00/03-16-016-12W4/0
Location Alias: 00/03-16-16-12 W4M
Location Alias 2: 00/03-16-016-12 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 12
Section: 16
County/Municipality: County of Newell
Well Name: CARDINAL ALDSON 3-16-16-12
Operator Name: Cardinal Energy Ltd.
License Number: 0196987
License Date: 1997-01-21
License Status: Suspension
Spud Date: 1997-02-15
Final Drill Date: 1997-02-19
Well Total Depth: 1120.00 m
Surface Hole Latitude: 50.339766
Surface Hole Longitude: -111.606130

For data sources see[1][2]

Well History

Date Event
1997-01-21 Obtained License
1997-02-15 Direction Drilling Operation Performed - Deviate
1997-02-16 Surface Casing Operation Performed
1997-02-19 Finished Drilling
1997-02-19 Well Log Performed
1997-02-19 Well Mode changed to Drilled and Cased
1997-02-20 Production Casing Operation Performed
1997-02-20 Rig Released
1997-02-20 Well Log Performed
1997-03-14 Well Log Performed
1997-03-18 Well Log Performed
1997-03-19 Perforation Treatment Performed - Jet Perforation
1997-06-05 Well Began Production
1997-06-05 Well Fluid changed to Crude Oil
1997-06-05 Well Mode changed to Pumping
1999-10-01 Well Fluid changed to Crude Oil
1999-10-01 Well Mode changed to Suspended
2003-02-27 Well Fluid changed to Crude Oil
2003-02-27 Well Mode changed to Pumping
2003-07-01 Well Fluid changed to Crude Oil
2003-07-01 Well Mode changed to Suspended
2005-09-30 Well Fluid changed to Crude Oil
2005-09-30 Well Mode changed to Pumping
2010-06-09 Well Fluid changed to Crude Oil
2010-06-09 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-02-15 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-03-19 Perforation 1077.50 1079.80 20
1997-03-19 Perforation 1080.80 1083.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1645 0.0 0.0 0.0
1998 288 0.0 0.0 0.0
2003 2380 0.0 0.0 0.0
2005 2112 0.0 0.0 0.0
2006 48 0.0 0.0 0.0
2007 4511 0.0 0.0 0.0
2008 2590 0.0 0.0 0.0
2009 504 0.0 0.0 0.0

For data sources see[6]

References