X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164121406020

Well Details

Well ID: 0164121406020
Loading map...
Location: 02/06-14-016-12W4/0
Location Alias: 02/06-14-16-12 W4M
Location Alias 2: 02/06-14-016-12 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 12
Section: 14
County/Municipality: County of Newell
Well Name: CARDINAL ALDSON 6-14-16-12
Operator Name: Cardinal Energy Ltd.
License Number: 0119687
License Date: 1985-11-26
License Status: Abandoned
Spud Date: 1985-11-29
Final Drill Date: 1985-12-03
Well Total Depth: 993.00 m
Surface Hole Latitude: 50.345070
Surface Hole Longitude: -111.554685

For data sources see[1][2]

Well History

Date Event
1985-11-26 Obtained License
1985-11-30 Surface Casing Operation Performed
1985-12-03 Finished Drilling
1985-12-03 Well Log Performed
1985-12-03 Well Mode changed to Drilled and Cased
1985-12-04 Drill Stem Test Performed
1985-12-06 Production Casing Operation Performed
1985-12-06 Rig Released
1985-12-11 Perforation Treatment Performed - Jet Perforation
1985-12-13 Well Began Production
1985-12-13 Well Fluid changed to Crude Oil
1985-12-13 Well Mode changed to Flowing
1988-09-06 Well Fluid changed to Crude Oil
1988-09-06 Well Mode changed to Pumping
1995-04-20 Perforation Treatment Performed - Cement Squeeze
1995-04-20 Plug Back Performed
1995-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-23 Perforation Treatment Performed - Jet Perforation
1995-04-23 Well Log Performed
1995-09-22 Well Fluid changed to Crude Oil
1995-09-22 Well Mode changed to Suspended
1995-09-23 Well Began Injection
1995-09-23 Well Fluid changed to Water
1995-09-23 Well Type changed to Disposal
1995-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-07-22 Well Log Performed
2009-01-13 Perforation Treatment Performed - Bridge Plug No Cement Required
2009-01-13 Well Fluid changed to Water
2009-01-13 Well Mode changed to Abandoned Zone
2009-01-13 Well Type changed to Disposal
2009-09-15 Perforation Treatment Performed - Jet Perforation
2009-09-15 Well Log Performed
2009-09-16 Perforation Treatment Performed - Cement Plug
2009-09-16 Perforation Treatment Performed - Remedial Casing
2009-09-17 Perforation Treatment Performed - Cement Plug
2009-09-17 Well Log Performed
2009-10-13 Well Abandoned
2009-10-13 Well Fluid changed to Water
2009-10-13 Well Mode changed to Abandoned
2009-10-13 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-12-11 Perforation 974.00 976.50 7
2009-09-17 Cement Plug 277.20 285.20 0
1995-04-20 Cement Squeeze 974.00 976.50 0
1995-04-23 Perforation 977.00 979.00 13
1995-04-23 Acid Treatment 977.00 979.00 0
1995-09-28 Acid Treatment 977.00 979.00 0
2009-01-13 Bridge Plug, No Cement 967.90 968.00 0
2009-09-15 Perforation 285.00 290.00 13
2009-09-16 Remedial Casing Cementing 285.00 290.00 0
2009-09-16 Cement Plug 285.20 305.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 404 0.0 0.0 0.0
1986 7458 0.0 0.0 0.0
1987 8040 0.0 0.0 0.0
1988 8727 0.0 0.0 0.0
1989 8683 0.0 0.0 0.0
1990 8506 0.0 0.0 0.0
1991 8465 0.0 0.0 0.0
1992 7905 0.0 0.0 0.0
1993 8716 0.0 0.0 0.0
1994 8688 0.0 0.0 0.0
1995 2124 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0

For data sources see[5]

References