X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164120407022

Well Details

Well ID: 0164120407022
Loading map...
Location: 02/07-04-016-12W4/2
Location Alias: 02/07-04-16-12 W4M
Location Alias 2: 02/07-04-016-12 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 12
Section: 04
County/Municipality: County of Newell
Well Name: TXNE ALDSON 7-4-16-12
Operator Name: Torxen Energy Ltd.
License Number: 0157728
License Date: 1993-04-07
License Status: Issued
Spud Date: 1993-04-22
Final Drill Date: 1993-04-27
Well Total Depth: 1001.00 m
Surface Hole Latitude: 50.316509
Surface Hole Longitude: -111.592905

For data sources see[1][2]

Well History

Date Event
1993-04-07 Obtained License
1993-04-23 Surface Casing Operation Performed
1993-04-27 Finished Drilling
1993-04-27 Well Log Performed
1993-04-27 Well Mode changed to Drilled and Cased
1993-04-28 Well Log Performed
1993-04-29 Production Casing Operation Performed
1993-04-29 Rig Released
1993-05-15 Well Log Performed
1993-05-16 Perforation Treatment Performed - Jet Perforation
1999-03-28 Perforation Treatment Performed - Jet Perforation
1999-03-28 Well Log Performed
1999-03-28 Well Mode changed to Drilled and Cased
1999-04-07 Perforation Treatment Performed - Fractured
1999-04-14 Well Log Performed
1999-04-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-04-16 Plug Back Performed
1999-04-16 Well Log Performed
1999-04-16 Well Mode changed to Abandoned Zone
2002-04-03 Well Log Performed
2002-04-17 Well Log Performed
2002-04-26 Perforation Treatment Performed - Jet Perforation
2002-04-30 Perforation Treatment Performed - Fractured
2005-02-15 Perforation Treatment Performed - Jet Perforation
2005-03-09 Perforation Treatment Performed - Fractured
2005-05-16 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-05-16 Perforation 707.50 708.50 20
2005-02-15 Perforation 328.00 330.00 7
2005-02-15 Perforation 315.00 317.00 7
2005-02-15 Perforation 302.00 304.00 7
2005-02-15 Perforation 291.00 293.00 7
2005-02-15 Perforation 280.00 282.00 7
2005-03-09 Fracture 344.00 346.00 0
2005-03-09 Fracture 328.00 330.00 0
2005-03-09 Fracture 315.00 317.00 0
2005-03-09 Fracture 302.00 304.00 0
2005-03-09 Fracture 291.00 293.00 0
1999-03-28 Perforation 859.00 861.00 20
2005-03-09 Fracture 280.00 282.00 0
1999-03-28 Perforation 862.00 864.00 20
1999-04-07 Fracture 859.00 864.00 0
1999-04-16 Packing Device Capped w/Cement 842.00 850.00 0
1999-04-16 Packing Device Capped w/Cement 690.00 698.00 0
2002-04-26 Perforation 606.50 609.50 7
2002-04-30 Fracture 606.50 609.50 0
2005-02-15 Perforation 344.00 346.00 7

For data sources see[4]



References